Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (5)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 44 (5)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 55 (4)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (47)
- CROSS Newsletter (19)
- CROSS Safety Report (47)
- (-) News [sub-heading only] (47)
CROSS regions
Safety concerns with twin wall system
A reporter raises safety concerns over the temporary stability of twin wall systems after they observed failures during construction.
1 April 2014
CROSS Safety Report
Report ID: 402
Region: CROSS-UK
Swimming pool ceiling partial collapse
Part of a ceiling above a swimming pool collapsed, injuring four people.
1 April 2015
CROSS Safety Report
Report ID: 426
Region: CROSS-UK
Fabrication different from design drawings
A reporter shares their experience of how a propping design they had undertaken was fabricated and installed but not in accordance with the design drawings.
1 July 2015
CROSS Safety Report
Report ID: 513
Region: CROSS-UK
Fibrous plaster ceiling features
This recent report of a serious concern about an old fibrous plaster ceiling has similarities to the Apollo Theatre ceiling collapse in London in December 2013.
1 July 2015
CROSS Safety Report
Report ID: 518
Region: CROSS-UK
Roof constructed without structural input
A reporter wants to highlight the problem of builders working off plans provided by an architect or surveyor and assuming that section sizes shown on their drawings are structurally adequate.
1 January 2016
CROSS Safety Report
Report ID: 515
Region: CROSS-UK
Fixing systems for gravestones
This report is about the safety of pins used to hold headstones in place.
1 October 2016
CROSS Safety Report
Report ID: 601
Region: CROSS-UK
Padstones out of position leads to collapse
This report concerns the partial collapse of a terrace of four storey houses during construction due to padstones being placed incorrectly.
1 April 2017
CROSS Safety Report
Report ID: 602
Region: CROSS-UK
Changes in temporary works scheme
Changes in the construction programme on site led to the construction of the superstructure of a building, without the liner wall below it being completed.
1 April 2017
CROSS Safety Report
Report ID: 603
Region: CROSS-UK
Sudden hole in piling mat - update
This is further information about report 566 which highlighted how a sudden hole appeared in a piling mat.
1 October 2016
CROSS Safety Report
Report ID: 596
Region: CROSS-UK
Inadequate structural design of school extension
On review of a design for a school extension, a reporter noted several major issues including an almost total lack of vertical bracing throughout the extension.
1 October 2016
CROSS Safety Report
Report ID: 597
Region: CROSS-UK