Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Inadequate structural design on industrial steel structures
A reporter's firm believes that steel structures associated with plant are being erected without a design being carried out by a structural engineer and are therefore potentially dangerous.
1 April 2019
CROSS Safety Report
Report ID: 804
Region: CROSS-UK
Cantilevered brickwork - fatal collapse during construction
A blade of 270mm cavity brickwork in a temporary condition fell and killed a bricklayer after sixteen scaffold planks were leant against the wall on the side remote from the bricklayer.
1 April 2015
CROSS Safety Report
Report ID: 476
Region: CROSS-UK
Large stone panel falls from building façade
A reporter witnessed a large stone panel detach from a second floor beam and fall to the ground, narrowly missing a group of school children.
1 July 2019
CROSS Safety Report
Report ID: 467
Region: CROSS-UK
PV panels blown off roof
Concerns are raised about the adequacy of fixings for PV panels after panels were blown off of a flat roof.
1 October 2015
CROSS Safety Report
Report ID: 519
Region: CROSS-UK
PV panels on domestic roof
A reporter raises concerns as they suspect PV panels are being erected on domestic (and commercial) roofs across the UK without adequate engineering analysis and design.
1 October 2015
CROSS Safety Report
Report ID: 528
Region: CROSS-UK
Installation of PV panels
A reporter's firm believes an oversaturated market of engineers carrying out assessments has drove the prices for assessments on roof structures accommodating PV panels down.
1 April 2016
CROSS Safety Report
Report ID: 533
Region: CROSS-UK
Scaffold support overturns
A 5m high support scaffold screened with fabric overturned when airflow was introduced to a building.
1 January 2017
CROSS Safety Report
Report ID: 575
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.