Safety information search results
Filter your results
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK [sub-heading only] (16)
- (-) CROSS Newsletter (17)
- CROSS Safety Report (17)
- News [sub-heading only] (3)
CROSS regions
Effect of staff change on a design
A reporter illustrates how risk can be generated from staff turnover.
1 October 2012
CROSS Safety Report
Report ID: 277
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Responsibilities for hybrid concrete construction
Concerns are raised after a substantial precast element, weighing over 10t, had been placed in position and used as part of the shuttering for an in-situ pour without it being designed to act as a shutter.
1 October 2016
CROSS Safety Report
Report ID: 574
Region: CROSS-UK
GRP panels as permanent shuttering
A reporter highlights problems that were encountered when Glassfibre Reinforced Plastic (GRP) panels were used as permanent formwork on a highway construction project.
1 October 2012
CROSS Safety Report
Report ID: 342
Region: CROSS-UK
Falsework collapse during slab pour in SE Asia
There was a partial collapse of falsework on a project in Southeast Asia.
1 July 2013
CROSS Safety Report
Report ID: 337
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Inadequate billets used in precast concrete connections
Whilst completing a third-party design appraisal, a correspondent found that solid steel billets intended to form the primary shear transfer mechanism between concrete beams and columns were insufficient for this purpose.
1 April 2019
CROSS Safety Report
Report ID: 705
Region: CROSS-UK
Architect conducts structural design of sway frame for domestic project
A reporter looked at a project recently where the drawings had been produced by the architect, including a structural design.
1 April 2018
CROSS Safety Report
Report ID: 678
Region: CROSS-UK
Quality of design and construction of a major bridge structure
This report concerns the design and installation of the bridge bearing zones on a new prestressed precast concrete viaduct.
1 October 2018
CROSS Safety Report
Report ID: 781
Region: CROSS-UK
Padstones out of position leads to collapse
This report concerns the partial collapse of a terrace of four storey houses during construction due to padstones being placed incorrectly.
1 April 2017
CROSS Safety Report
Report ID: 602
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.