Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK [sub-heading only] (8)
- (-) CROSS Newsletter (8)
- CROSS Safety Report (8)
- News [sub-heading only] (4)
CROSS regions
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Stability of terraced buildings
A reporter is concerned about a terrace of four buildings the third of which is being opened up.
1 April 2015
CROSS Safety Report
Report ID: 448
Region: CROSS-UK
Fabrication different from design drawings
A reporter shares their experience of how a propping design they had undertaken was fabricated and installed but not in accordance with the design drawings.
1 July 2015
CROSS Safety Report
Report ID: 513
Region: CROSS-UK
Estuary bridge - failure of stainless steel tie bars
Concerns were raised after a principal inspection of a bridge found that numerous tie bars connecting the original bridge to strengthened footways had failed.
1 October 2015
CROSS Safety Report
Report ID: 522
Region: CROSS-UK
Inadequate structural design of school extension
On review of a design for a school extension, a reporter noted several major issues including an almost total lack of vertical bracing throughout the extension.
1 October 2016
CROSS Safety Report
Report ID: 597
Region: CROSS-UK
Architect conducts structural design of sway frame for domestic project
A reporter looked at a project recently where the drawings had been produced by the architect, including a structural design.
1 April 2018
CROSS Safety Report
Report ID: 678
Region: CROSS-UK
Add-on timber trussed roof to flat roof causes failure
A reporter discusses how, while visiting a property for an unrelated matter, they spotted something odd about the roof; the gable had bulged at one end and movement had clearly occurred.
1 October 2018
CROSS Safety Report
Report ID: 742
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.