Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (20)
- (-) CROSS Newsletter (26)
- CROSS Safety Report (26)
- News [sub-heading only] (3)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Dangerous design of a retaining wall
Serious errors were made in the input to a computer program used for designing a 1.8m high retaining wall.
29 March 2021
CROSS Safety Report
Report ID: 989
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Near collapse of masonry highway bridge
Works adjacent to a masonry arch bridge caused the foundations to subside and damage the bridge beyond repair.
1 October 2012
CROSS Safety Report
Report ID: 286
Region: CROSS-UK
Viaduct survey concerns
A reporter raises concerns about a small four span brickwork railway viaduct that has been degrading for some time.
1 January 2014
CROSS Safety Report
Report ID: 346
Region: CROSS-UK
Wall collapse from building in city centre - who is responsible?
A 4-4.5m high wall, approximately 18m long, and nearly 40t of bricks collapsed into a road crushing three empty vehicles.
1 January 2013
CROSS Safety Report
Report ID: 306
Region: CROSS-UK
Brick wall removed to leave precast panels unsupported
Precast concrete slabs were left unsupported after a supporting brick wall was removed during demolition works.
1 July 2014
CROSS Safety Report
Report ID: 384
Region: CROSS-UK
High winds cause masonry parapet failure
A reporter highlights how exceptionally strong winds caused a fourth-floor level masonry parapet wall with a 1.7m high timber fencing on top of it to collapse.
1 April 2019
CROSS Safety Report
Report ID: 803
Region: CROSS-UK
Stability of brick walls
A 230mm cantilevered brick wall approximately 1.6m high failed after backfill material was placed behind it, which was not the design intent.
1 April 2015
CROSS Safety Report
Report ID: 475
Region: CROSS-UK