Safety information search results
Filter your results
Building or structure type
- Bridges (6)
- Buildings
(23)
- Car parks (3)
- Commercial (3)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (1)
- Health care (1)
- Industrial buildings (1)
- Laboratory buildings (1)
- LPS buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (1)
- Recreational buildings (1)
- Residential (5)
- Stadiums (1)
- Tall buildings (1)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Railways (1)
- Retaining structures (1)
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (1)
- Assessment project [sub-heading only] (2)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (14)
- Fire safety assessment (1)
- New build (11)
- Refurbishment (1)
- Remediation project (2)
- Strengthening project (1)
- Structural assessment (3)
- Underpinning project (1)
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (3)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (17)
- CROSS Newsletter (7)
- (-) CROSS Safety Report (29)
- News [sub-heading only] (1)
CROSS regions
Structural corrosion in a swimming pool building causes concern
A survey showed severe corrosion of previously repaired steelwork columns adjacent to a public swimming pool.
30 July 2021
CROSS Safety Report
Report ID: 1004
Region: CROSS-UK
Waterproofing exposed concrete slabs
This report highlights that water ingress into buildings continues to be a problem and discusses the role of the structural engineer when dealing with waterproofing of exposed concrete slabs. It shows how this can be achieved by careful design and detailing of the reinforced concrete structure and by close collaboration of all parties involved.
25 November 2021
CROSS Safety Report
Report ID: 959
Region: CROSS-AUS
Grouting of joints between load-bearing prefabricated concrete members
This report highlights the risk of failure if grouted joints between load-bearing prefabricated concrete members are not designed and installed correctly.
30 April 2021
CROSS Safety Report
Report ID: 961
Region: CROSS-AUS
Further example of incorrect finite element modelling
Concerns in respect of the sufficiency of finite element modelling of masonry walls as part of a reinforced concrete framed building.
20 February 2023
CROSS Safety Report
Report ID: 1145
Region: CROSS-UK
Unsuitable underpinning
When reviewing a consulting engineer’s proposal to underpin a party wall, the reporter noticed that there was insufficient vertical load to maintain stability under lateral load from the retained height of soil.
1 July 2010
CROSS Safety Report
Report ID: 175
Region: CROSS-UK
Design deficiencies in calculations submitted to a Local Authority
A Local Authority Building Control manager has sent a list which gives twenty nine of the more serious design review queries raised by the building control structural checking process over the last five years.
1 October 2010
CROSS Safety Report
Report ID: 210
Region: CROSS-UK
Structural assessments of multi-storey car parks
The parking industry has in recent years (2012) seen several MSCPs closed due to structural fears, says a reporter, which begs the question how close were they to structural failure before they were taken out of service?
1 April 2012
CROSS Safety Report
Report ID: 224
Region: CROSS-UK
Asymmetric bridge design and construction – a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
1 October 2011
CROSS Safety Report
Report ID: 262
Region: CROSS-UK
Multi-storey car parks - structural condition concerns
A reporter raises concerns about the structural condition of a number of car parks that they have worked on as remediation projects.
1 April 2012
CROSS Safety Report
Report ID: 265
Region: CROSS-UK
Compatibility at RC column to slab joint - strong column/weak slab
A reporter who was reviewing the structural design of a commercial building raises concerns over the compatibility at column/slab joints when different grades of concrete are used.
1 April 2012
CROSS Safety Report
Report ID: 296
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.