Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK [sub-heading only] (9)
- CROSS Newsletter (7)
- (-) CROSS Safety Report (13)
- News [sub-heading only] (1)
CROSS regions
Galvanic (bimetallic) corrosion not considered in cladding design
A cladding designer and installer did not consider galvanic (bimetallic) corrosion which led to remedial works being required.
30 June 2022
CROSS Safety Report
Report ID: 811
Region: CROSS-UK
Accelerated corrosion of telecoms mast holding down bolts
During an examination of a 20m high telecoms mast, a reporter found that there had been accelerated corrosion of the galvanised holding down bolts.
1 June 2022
CROSS Safety Report
Report ID: 773
Region: CROSS-UK
Concern about bridge hangers
A reporter is concerned that a failure in recent years involving the cast connections at each end of vertical bars, which connected to a bow string arch at one end and to a bridge deck at the other, may be in use elsewhere.
1 July 2012
CROSS Safety Report
Report ID: 222
Region: CROSS-UK
Concerns over corrosion of dissimilar metals in fixing cavity wall tie systems
A reporter is concerned about corrosion that may occur between dissimilar metals that can be used in cavity wall tie systems. The reporter has noted that stainless steel and carbon steel may be fixed together in wall cavities, which are damp environments, and that corrosion of dissimilar metals in contact may occur.
24 May 2023
CROSS Safety Report
Report ID: 1186
Region: CROSS-UK
Liquid metal assisted cracking
Large cracks appeared down the sides of gusset welds after a truss was erected on site.
1 November 2006
CROSS Safety Report
Report ID: 49
Region: CROSS-UK
Grades of weldable quality bolts
A reporter says grade 8.8 bolts are not required to be manufactured as being weldable according to the relevant product standards e.g. ISO 898-1 and -2.
1 April 2014
CROSS Safety Report
Report ID: 392
Region: CROSS-UK
Offshore tower failure
The top two thirds of a three part off-shore lattice mast failed due to problems with some of the connection bolts.
1 January 2014
CROSS Safety Report
Report ID: 358
Region: CROSS-UK
Failure of anchor bolts holding suspended scaffold
During the removal of a suspended scaffold, it was found that a number of the screw bolt anchors had failed.
1 July 2015
CROSS Safety Report
Report ID: 430
Region: CROSS-UK
Failure of high strength studs
A reporter raises concerns after several M12 threaded studs snapped not long after installation.
1 April 2015
CROSS Safety Report
Report ID: 499
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.