Safety information search results
Filter your results
Building or structure type
- Bridges (32)
- Buildings
(242)
- Agricultural buildings (1)
- Car parks (11)
- Commercial (20)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (9)
- Health care (3)
- Higher-risk buildings (1)
- Industrial buildings (4)
- Public, religious & civic buildings (6)
- Recreational buildings (5)
- Residential (65)
- Stadiums (1)
- Storage buildings (3)
- Tall buildings (8)
- Theatres & other entertainment buildings (6)
- Transport buildings (2)
- Buried pipes & culverts (3)
- Freestanding walls (1)
- Masts & towers (11)
- Railways (6)
- Reservoirs & dams (1)
- Retaining structures (23)
- Roads (6)
- Sewers (4)
- Temporary structures (28)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (3)
- Design: quality management (26)
- Design calculations (28)
- Design conceptualisation (11)
- Design detailing (67)
- Design drawings (24)
- Design loads (50)
- Design software (8)
- Dynamics (4)
- Fire safety design (9)
- Resilience (6)
- Robustness (22)
- Structural design (68)
- Sustainability (2)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (22)
- Assessment project [sub-heading only] (7)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (184)
- Demolition project (3)
- Excavation (15)
- Extension project (12)
- Groundworks project (2)
- Maintenance project (2)
- New build (104)
- Refurbishment (9)
- Remediation project (13)
- Repair project (6)
- Strengthening project (4)
- Structural assessment (8)
- Underpinning project (3)
Construction period
Method of construction
Elements & systems
- Arch (2)
- Balconies (8)
- Balustrades (14)
- Basements (7)
- Beams (55)
- Bracing (14)
- Cables (1)
- Canopies (1)
- Ceilings (11)
- Cladding (26)
- Columns (30)
- Fasteners & connections (115)
- Fire protection (7)
- Foundations (30)
- Insulation (6)
- Light gauge steel framing (6)
- Lintels (3)
- Padstones (5)
- Parapets (5)
- PV panels (1)
- Roofs (34)
- Sandwich panels (1)
- Signs (4)
- Slabs (35)
- Tendons (1)
- Trusses (8)
- Wall head restraints (2)
- Walls (69)
- Wall ties (10)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (5)
- CROSS-AUS Newsletter 3 (4)
- CROSS-AUS Newsletter 4 (3)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS Newsletter 8 (1)
- CROSS-AUS [sub-heading only] (14)
- CROSS-UK Newsletter 1 (5)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (3)
- CROSS-UK Newsletter 4 (8)
- CROSS-UK Newsletter 5 (4)
- CROSS-UK Newsletter 6 (5)
- CROSS-UK Newsletter 7 (3)
- CROSS-UK Newsletter 8 (4)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (4)
- CROSS-UK Newsletter 11 (3)
- CROSS-UK Newsletter 12 (4)
- CROSS-UK Newsletter 13 (4)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 17 (3)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 19 (4)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 21 (4)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (4)
- CROSS-UK Newsletter 30 (7)
- CROSS-UK Newsletter 31 (5)
- CROSS-UK Newsletter 32 (6)
- CROSS-UK Newsletter 33 (4)
- CROSS-UK Newsletter 34 (6)
- CROSS-UK Newsletter 35 (6)
- CROSS-UK Newsletter 36 (3)
- CROSS-UK Newsletter 37 (5)
- CROSS-UK Newsletter 38 (6)
- CROSS-UK Newsletter 39 (5)
- CROSS-UK Newsletter 40 (3)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (9)
- CROSS-UK Newsletter 43 (5)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (4)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (7)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (5)
- CROSS-UK Newsletter 50 (4)
- CROSS-UK Newsletter 51 (5)
- CROSS-UK Newsletter 52 (6)
- CROSS-UK Newsletter 53 (3)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (6)
- CROSS-UK Newsletter 56 (5)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (7)
- CROSS-UK Newsletter 59 (6)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (2)
- CROSS-UK Newsletter 62 (4)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (3)
- CROSS-UK [sub-heading only] (241)
- CROSS-US Newsletter 1 (3)
- CROSS-US Newsletter 2 (3)
- CROSS-US Newsletter 3 (2)
- CROSS-US [sub-heading only] (6)
- CROSS Newsletter (146)
- (-) CROSS Safety Report (406)
- News [sub-heading only] (47)
- Safety information [sub-heading only] (1)
CROSS regions
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Embankment stability concerns after heavy rainfall
During the construction of a building the top edge of the steepest section of an embankment moved outwards and downwards after a period of heavy rainfall.
1 November 2005
CROSS Safety Report
Report ID: 3
Region: CROSS-UK
Stud framing with self-tapping screws
A reporter raises concerns about contractors not using the specified screws for constructing metal stud frame walls.
1 November 2005
CROSS Safety Report
Report ID: 11
Region: CROSS-UK
Fixings to steelwork
The use of proprietary self tapping screws to fix to materials thicker than 10-12mm is questioned by a reporter.
1 November 2006
CROSS Safety Report
Report ID: 44
Region: CROSS-UK
Liquid metal assisted cracking (LMAC)
A reporter raises concerns about the risk of liquid metal assisted cracking during the hot dip galvanising process.
1 November 2006
CROSS Safety Report
Report ID: 45
Region: CROSS-UK
Very slender props
A reporter noticed prop that did not have ties installed while carrying out a site inspection.
1 July 2007
CROSS Safety Report
Report ID: 34
Region: CROSS-UK
Responsibility for change
The inadequate substitution of lintels led to them buckling, and the surrounding masonry cracking.
1 February 2007
CROSS Safety Report
Report ID: 50
Region: CROSS-UK
Missing starter bars
During an inspection the reporter observed that all the continuity starter bars projecting from the wall kicker were in fact loose.
1 July 2007
CROSS Safety Report
Report ID: 37
Region: CROSS-UK
Grouting of joints between load-bearing prefabricated concrete members
This report highlights the risk of failure if grouted joints between load-bearing prefabricated concrete members are not designed and installed correctly.
30 April 2021
CROSS Safety Report
Report ID: 961
Region: CROSS-AUS
Structural failure of older timber connections
A reporter shares three examples of the structural failure or inadequacies of connections in existing timber structures that they have encountered.
13 December 2021
CROSS Safety Report
Report ID: 1040
Region: CROSS-UK