Safety information search results
Filter your results
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK [sub-heading only] (14)
- CROSS Newsletter (7)
- CROSS Safety Report (15)
- News [sub-heading only] (3)
CROSS regions
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Concrete half joints
Poor reinforcement detailing and installation in a half joint led to the collapse of a series of beams and precast concrete slabs.
1 January 2008
CROSS Safety Report
Report ID: 88
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Precast joint failures
A reporter is interested in CROSS’s evidence about joint failures in concrete. They feel that the same failures keep arising from similar circumstances with none of the lessons having been learnt.
1 July 2008
CROSS Safety Report
Report ID: 107
Region: CROSS-UK
Multi-storey car parks - structural condition concerns
A reporter raises concerns about the structural condition of a number of car parks that they have worked on as remediation projects.
1 April 2012
CROSS Safety Report
Report ID: 265
Region: CROSS-UK
Nuts falling from tension glazing system
A reporter raises concerns about the fixings used in a tension glazing system.
1 July 2013
CROSS Safety Report
Report ID: 340
Region: CROSS-UK
Steel stud failures during bridge construction
This report concerns the failure of a steel studs during construction works on a new bridge associated with major road improvements.
1 October 2012
CROSS Safety Report
Report ID: 332
Region: CROSS-UK
Timber roof truss bracing problem
Lateral movement of the roof tiles on a two-storey mid-terrace house built approximately 35 years ago with a trussed rafter roof led to the discovery of broken bracing.
1 July 2014
CROSS Safety Report
Report ID: 354
Region: CROSS-UK
Asymmetric bridge design and construction – a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
1 October 2011
CROSS Safety Report
Report ID: 262
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.