Safety information search results
Filter your results
Building or structure type
- Bridges (4)
- Buildings
(4)
- Agricultural buildings (1)
- Commercial (2)
- Education, science & art buildings (1)
- Health care (1)
- Industrial buildings (2)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (1)
- Residential (1)
- Stadiums (1)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Masts & towers (1)
- Railways (1)
Building height
Project or lifecycle stage
Operation or occupation
Fire incident response
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK [sub-heading only] (7)
- CROSS Newsletter (7)
- CROSS Safety Report (13)
- News [sub-heading only] (2)
CROSS regions
Dislodged finger plate on highway bridge
A correspondent received a report about a 1.5m long section of a steel finger plate expansion joint on a highway bridge that had been inadequately fixed and became dislodged.
1 February 2020
CROSS Safety Report
Report ID: 879
Region: CROSS-AUS
Light gauge steel fabrication
Referring to Report AUS-4, Light steel truss issues, this reporter has concerns about the low ductility of the high tensile steel, in particular with respect to connection design and capacity.
1 August 2020
CROSS Safety Report
Report ID: 957
Region: CROSS-AUS
Fatigue failure of bridge cross-girder
During a planned examination of a bridge, a cross-girder was found to have failed via fatigue.
23 May 2022
CROSS Safety Report
Report ID: 743
Region: CROSS-UK