Safety information search results
Filter your results
Building height
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (19)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (12)
- CROSS Safety Report (27)
- News [sub-heading only] (5)
CROSS regions
Temporary instability of columns
Concerns were raised by a reporter on the temporary stability of concrete columns during construction.
2 February 2023
CROSS Safety Report
Report ID: 872
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Very slender props
A reporter noticed prop that did not have ties installed while carrying out a site inspection.
1 July 2007
CROSS Safety Report
Report ID: 34
Region: CROSS-UK
Column stability during erection
A reporter highlights the importance of ensuring steel columns are temporarily supported until they are sufficiently tied and supported by the permanent structure.
13 December 2021
CROSS Safety Report
Report ID: 1038
Region: CROSS-UK
Steel column erection anchoring connection failure injured worker
This report describes how a construction worker was injured during the erection of a steel column due to shortcomings in erection procedures and inadequacies in a column base connection.
10 May 2021
CROSS Safety Report
Report ID: 992
Region: CROSS-US
Dangerous modification to a column
A reporter was requested to visit a warehouse to inspect work carried out to a main support column that had been modified by a builder.
1 July 2010
CROSS Safety Report
Report ID: 169
Region: CROSS-UK
Freezing splits galvanised SHS columns
Concerns were raised after several square hollow section members split vertically on a partially complete construction site.
1 April 2012
CROSS Safety Report
Report ID: 253
Region: CROSS-UK
Split responsibilities on temporary bracing of steelwork
A contractor removed temporary bracing on site prior to the structure being in a permanent stable state.
1 July 2010
CROSS Safety Report
Report ID: 204
Region: CROSS-UK
Concern about rebending starter bars
This report concerns the bending and rebending of starter bars on site during the construction of a multi storey tower. The reporter considered that such a practice could compromise the structure under extreme load conditions.
24 May 2023
CROSS Safety Report
Report ID: 1164
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.