Safety information search results
Filter your results
Building or structure type
Building height
Materials
Project or lifecycle stage
Operation or occupation
Fire incident response
Project type
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK [sub-heading only] (7)
- CROSS Newsletter (7)
- CROSS Safety Report (13)
- News [sub-heading only] (1)
CROSS regions
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Failure of blind bolts
There was a partial collapse of a steel frame building due to the failure of some blind bolts during the construction period. Loads at the time were well below anticipated failure levels.
1 April 2007
CROSS Safety Report
Report ID: 71
Region: CROSS-UK
Dangerous modification to a column
A reporter was requested to visit a warehouse to inspect work carried out to a main support column that had been modified by a builder.
1 July 2010
CROSS Safety Report
Report ID: 169
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Lack of experience on steel column erection
A reporter highlights how works progressed on site without a detailed method statement being provided by the contractor even though it had been requested.
1 April 2013
CROSS Safety Report
Report ID: 324
Region: CROSS-UK
Incorrect CE-marking of products
A reporter from Germany raises concerns about wrongly declared and/or insufficient Declaration of Performance (DoPs) for products according to the harmonized European standards with CE-marking.
1 January 2020
CROSS Safety Report
Report ID: 835
Region: CROSS-UK
Fabrication issues with imported steelwork truss in Australia
A reporter raises concerns after a steel truss had significant defects and deflected after erection requiring rectification.
1 July 2014
CROSS Safety Report
Report ID: 390
Region: CROSS-UK
Grades of weldable quality bolts
A reporter says grade 8.8 bolts are not required to be manufactured as being weldable according to the relevant product standards e.g. ISO 898-1 and -2.
1 April 2014
CROSS Safety Report
Report ID: 392
Region: CROSS-UK
Weld de-specification without design approval
A reporter's firm was engaged as fabricators for a main contractor and asked by them to de-specify full and partial penetration butt welds and replace them with fillet welds without approval from the main design engineer.
14 October 2020
CROSS Safety Report
Report ID: 845
Region: CROSS-UK
Execution not matching design assumptions
This report highlights how the connection of steel columns to twin beams acting as a transfer beam was overlooked and created an eccentric loading condition.
14 October 2020
CROSS Safety Report
Report ID: 968
Region: CROSS-UK