Safety information search results
Filter your results
Building or structure type
- Bridges (16)
- Buildings
(104)
- Agricultural buildings (1)
- Car parks (2)
- Commercial (11)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (10)
- Industrial buildings (1)
- Public, religious & civic buildings (5)
- Recreational buildings (5)
- Residential (18)
- Storage buildings (1)
- Tall buildings (7)
- Theatres & other entertainment buildings (6)
- Transport buildings (4)
- Masts & towers (11)
- Offshore structures (1)
- Railways (2)
- Retaining structures (3)
- Roads (1)
- Sewers (1)
- Temporary structures (8)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
Fire incident response
Method of construction
Elements & systems
- Balconies (5)
- Balustrades (9)
- Beams (23)
- Bracing (9)
- Cables (3)
- Canopies (3)
- Ceilings (20)
- Cladding (24)
- Columns (11)
- (-) Fasteners & connections (166)
- Fire protection (1)
- Foundations (9)
- Insulation (3)
- Light gauge steel framing (2)
- Padstones (1)
- Parapets (4)
- PV panels (1)
- Roofs (15)
- Sandwich panels (1)
- Signs (2)
- Slabs (2)
- Tendons (1)
- Trusses (7)
- Wall head restraints (1)
- Walls (8)
- Wall ties (4)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (5)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (3)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (4)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 17 (4)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 27 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (4)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 37 (4)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 60 (4)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (95)
- CROSS Newsletter (51)
- CROSS Safety Alert (4)
- CROSS Safety Report (161)
- News [sub-heading only] (23)
- Third party article (1)
- Third party content (1)
CROSS regions
Precast concrete panel fixing
A 1960s flyover was being demolished and an interesting feature came to light how the precast concrete edge panels were fixed.
30 June 2022
CROSS Safety Report
Report ID: 965
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Architectural panel acting as barrier
A reporter came across a scenario on site where an architectural decorative panel was acting as a barrier during the construction stage without being designed to act as one.
6 April 2023
CROSS Safety Report
Report ID: 927
Region: CROSS-UK
Masonry panels rock in wind due to missing wall ties
Wall ties designed to connect masonry partitions to adjacent steelwork framing were not installed leaving the masonry walls unrestrained. Walls were seen to be rocking in high winds.
17 February 2023
CROSS Safety Report
Report ID: 931
Region: CROSS-UK
Structural failure of older timber connections
A reporter shares three examples of the structural failure or inadequacies of connections in existing timber structures that they have encountered.
13 December 2021
CROSS Safety Report
Report ID: 1040
Region: CROSS-UK
CARES Alert: Unregulated reinforcement continuity systems
CARES is investigating unregulated reinforcement continuity systems entering the construction supply chain.
27 April 2021
Third party content
Publisher: CARES
Brick slips falling from height
A reporter describes cases of brick slips falling from height due to adhesive failures and considers that there is a danger to the public.
13 August 2021
CROSS Safety Report
Report ID: 1017
Region: CROSS-UK
Steel truss failure during lifting operation
The lifting operation for a 40m long span steel truss had to be abandoned after the localised failure of a joint.
13 December 2021
CROSS Safety Report
Report ID: 1035
Region: CROSS-UK
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK