Safety information search results
Filter your results
Safety area
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Content type
CROSS regions
Collapse of folded plate timber roof at a school
This report is about a critical safety issue concerning folded timber roofs, in various settings, including over school halls.
18 October 2023
CROSS Safety Report
Report ID: 1160
Region: CROSS-UK
RAAC planks in a 1970s shopping centre
An existing large shopping centre built circa 1975 had a number of external storerooms and loading bays with roofs constructed using reinforced autoclaved aerated concrete (RAAC) planks. The planks had deflected to the extent that they needed replacing.
20 February 2023
CROSS Safety Report
Report ID: 1155
Region: CROSS-UK
Overloading a portal frame with suspended services
A reporter designing a single storey portal frame used a standard roof service loading of 0.25kN/m2. After the project was completed, a tenant for the unit took over fit out and added a considerable amount of sprinkler pipework into the roof. This created local overloading.
21 August 2023
CROSS Safety Report
Report ID: 1195
Region: CROSS-UK
Collapse of unusual hybrid concrete and steel strand truss on school roof
This report concerns the collapse of a school hall roof which resulted from the failure of one of a number of unusual hybrid concrete and steel strand trusses. The trusses consist of a precast reinforced concrete top chord and verticals with a bottom chord of tensioned steel strands. The failure of the truss resulted in the collapse of the supported flat roof local to the failed truss, and da...
25 May 2023
CROSS Safety Report
Report ID: 1227
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Construction period of RAAC planks
A reporter says that there are structural issues with reinforced autoclaved aerated concrete (RAAC) panels installed in a building as late as 1998. This date is significantly later than previous reports suggest as the last significant use of RAAC elements in the UK.
20 February 2023
CROSS Safety Report
Report ID: 954
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.