Safety information search results
Filter your results
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 18 (3)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (3)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (16)
- CROSS Newsletter (10)
- CROSS Safety Report (30)
- News [sub-heading only] (2)
CROSS regions
Collapse of Large Panel System (LPS) buildings during demolition
In 2009, numerous progressive and unexpected collapses occurred during the demolition of Large Panel System (LPS) tower blocks.
1 April 2010
CROSS Safety Report
Report ID: 186
Region: CROSS-UK
Large Panel System (LPS) building structural refurbishment issues
A reporter from a firm of consulting engineers’ comments on his experiences when refurbishing 1960s Large Panel Structure (LPS) buildings around 2000.
1 July 2011
CROSS Safety Report
Report ID: 201
Region: CROSS-UK
Composition of new precast concrete blocks
A UK firm has raised concerns over a new large precast concrete block range which seems to use a wide range of secondary recycled aggregates in its mix, including some potentially hazardous waste.
1 July 2014
CROSS Safety Report
Report ID: 380
Region: CROSS-UK
Brick wall removed to leave precast panels unsupported
Precast concrete slabs were left unsupported after a supporting brick wall was removed during demolition works.
1 July 2014
CROSS Safety Report
Report ID: 384
Region: CROSS-UK
Wall reinforcement cages collapse
A contractor says that they have experienced two cases of wall reinforcement cages collapsing.
1 April 2013
CROSS Safety Report
Report ID: 357
Region: CROSS-UK
Safety concern about the design of thin concrete walls
The reporter raises their concern about the design of thin concrete load-bearing walls, sometimes supporting 10 or more storeys.
1 July 2019
CROSS Safety Report
Report ID: 815
Region: CROSS-AUS
Failure of precast concrete 'L' shaped retaining wall
A recent incident occurred on a site, where a temporary precast retaining wall failed leading to a pile of clay approximately 3m high spilling through the wall.
1 July 2014
CROSS Safety Report
Report ID: 433
Region: CROSS-UK
Safety concerns with twin wall system
A reporter raises safety concerns over the temporary stability of twin wall systems after they observed failures during construction.
1 April 2014
CROSS Safety Report
Report ID: 402
Region: CROSS-UK
Failure of epoxy resin bonded anchors in concrete
A reporter expresses concern about adhesive bonded anchors after anchors failed progressively on site during a lifting operation.
1 April 2014
CROSS Safety Report
Report ID: 429
Region: CROSS-UK
High strength concrete incident
Confusion on sites lead to the incorrect concrete grade being used for some structural elements.
1 April 2014
CROSS Safety Report
Report ID: 406
Region: CROSS-UK