Safety information search results
Filter your results
Building or structure type
- Bridges (20)
- Buildings
(101)
- Car parks (9)
- Commercial (6)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (3)
- Health care (1)
- Higher-risk buildings (1)
- Industrial buildings (2)
- Laboratory buildings (1)
- LPS buildings (4)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (1)
- Recreational buildings (2)
- Residential (25)
- Stadiums (1)
- Storage buildings (3)
- Tall buildings (5)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Buried pipes & culverts (2)
- Masts & towers (3)
- Railways (6)
- Retaining structures (11)
- Roads (5)
- Sewers (2)
- Temporary structures (4)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (6)
- Assessment project [sub-heading only] (8)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (84)
- Demolition project (8)
- Excavation (1)
- Extension project (3)
- Fire safety assessment (1)
- Groundworks project (1)
- New build (61)
- Refurbishment (4)
- Remediation project (6)
- Repair project (3)
- Strengthening project (4)
- Structural assessment (10)
- Underpinning project (1)
Construction period
Elements & systems
- Balconies (4)
- Balustrades (1)
- Basements (4)
- Beams (31)
- Bracing (4)
- Canopies (1)
- Ceilings (3)
- Cladding (2)
- Columns (24)
- Fasteners & connections (31)
- Fire protection (3)
- Foundations (16)
- Insulation (2)
- Light gauge steel framing (1)
- Lintels (1)
- Padstones (2)
- Parapets (6)
- Roofs (10)
- Shear walls (1)
- Signs (2)
- Slabs (50)
- Tendons (1)
- Wall head restraints (1)
- Walls (30)
- Wall ties (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 4 (5)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (9)
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (3)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (4)
- CROSS-UK Newsletter 19 (3)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (4)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 30 (4)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (3)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (3)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (4)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (7)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (90)
- CROSS-US Newsletter 2 (1)
- CROSS-US Newsletter 3 (2)
- CROSS Newsletter (57)
- CROSS Safety Alert (3)
- CROSS Safety Report (165)
- CROSS Theme Page (1)
- News [sub-heading only] (13)
- Third party article (1)
- Third party content (1)
CROSS regions
Precast concrete panel fixing
A 1960s flyover was being demolished and an interesting feature came to light how the precast concrete edge panels were fixed.
30 June 2022
CROSS Safety Report
Report ID: 965
Region: CROSS-UK
Roof collapse of warehouse structure under rainwater ponding
This report highlights the structural risk caused by rainwater ponding on relatively flat roofs.
10 May 2021
CROSS Safety Report
Report ID: 969
Region: CROSS-US
Channel slab roof deck collapse during reroofing
This report highlights the structural risk caused by machinery during reroof a project.
10 May 2021
CROSS Safety Report
Report ID: 970
Region: CROSS-US
Failure of prestressed hollowcore units during storage and transport
A reporter shares their experience of the failure of prestressed hollowcore units during storage and transport.
1 June 2022
CROSS Safety Report
Report ID: 748
Region: CROSS-UK
Waterproofing exposed concrete slabs
This report highlights that water ingress into buildings continues to be a problem and discusses the role of the structural engineer when dealing with waterproofing of exposed concrete slabs. It shows how this can be achieved by careful design and detailing of the reinforced concrete structure and by close collaboration of all parties involved.
25 November 2021
CROSS Safety Report
Report ID: 959
Region: CROSS-AUS
Grouting of joints between load-bearing prefabricated concrete members
This report highlights the risk of failure if grouted joints between load-bearing prefabricated concrete members are not designed and installed correctly.
30 April 2021
CROSS Safety Report
Report ID: 961
Region: CROSS-AUS
Concern over modelling of concrete frame building for construction stage
Independent check shows inadequate modelling of concrete frame building with transfer slab.
10 March 2022
CROSS Safety Report
Report ID: 1073
Region: CROSS-UK
Continuously threaded reinforcing bar
This report highlights the difficulty of inspecting continuously threaded reinforcing bars to ensure that they have been adequately inserted into the cast-in ferrules.
2 August 2022
CROSS Safety Report
Report ID: 1074
Region: CROSS-AUS
Further example of incorrect finite element modelling
Concerns in respect of the sufficiency of finite element modelling of masonry walls as part of a reinforced concrete framed building.
20 February 2023
CROSS Safety Report
Report ID: 1145
Region: CROSS-UK
Cantilever bridge parapet falsework failure
A reporter has experienced the failure of cantilever parapet falsework twice, for different reasons, using two different products during bridge construction.
20 February 2023
CROSS Safety Report
Report ID: 1159
Region: CROSS-UK