Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK [sub-heading only] (16)
- CROSS Newsletter (12)
- CROSS Safety Report (24)
CROSS regions
Temporary instability of columns
Concerns were raised by a reporter on the temporary stability of concrete columns during construction.
2 February 2023
CROSS Safety Report
Report ID: 872
Region: CROSS-UK
Incorrect lifting system used for precast concrete stair elements
A reporter was asked to inspect a precast concrete stair unit which was exhibiting cracking around the lifting anchor locations after being de-moulded.
13 December 2022
CROSS Safety Report
Report ID: 883
Region: CROSS-UK
Concrete half joints
Poor reinforcement detailing and installation in a half joint led to the collapse of a series of beams and precast concrete slabs.
1 January 2008
CROSS Safety Report
Report ID: 88
Region: CROSS-UK
Precast joint failures
A reporter is interested in CROSS’s evidence about joint failures in concrete. They feel that the same failures keep arising from similar circumstances with none of the lessons having been learnt.
1 July 2008
CROSS Safety Report
Report ID: 107
Region: CROSS-UK
Thermal effects on long span concrete car park beams
A reporter describes how long span precast hollow core units in a car park started to bow upwards due to thermal effects.
1 October 2010
CROSS Safety Report
Report ID: 173
Region: CROSS-UK
Collapse of a hollow core unit
This refers to the collapse of one modest span precast hollow core concrete unit and the excessive deflection of others on a building which was under construction.
1 October 2012
CROSS Safety Report
Report ID: 258
Region: CROSS-UK
Gain in strength of mortar slower than concrete
A masonry wall settled and cracked after four courses of Engineering grade B bricks were substituted (not by the designer) for the original in-situ concrete padstones on cost and handling grounds.
1 April 2010
CROSS Safety Report
Report ID: 177
Region: CROSS-UK
Asymmetric bridge design and construction – a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
1 October 2011
CROSS Safety Report
Report ID: 262
Region: CROSS-UK
Composition of new precast concrete blocks
A UK firm has raised concerns over a new large precast concrete block range which seems to use a wide range of secondary recycled aggregates in its mix, including some potentially hazardous waste.
1 July 2014
CROSS Safety Report
Report ID: 380
Region: CROSS-UK
Boom MEPW falls through precast planks
A high injury potential near-miss (near hit) incident occurred when a mobile elevated working platform (MEPW) fell through a floor at a point where there was a notched precast plank.
1 April 2013
CROSS Safety Report
Report ID: 359
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.