Safety information search results
Filter your results
Products
Project or lifecycle stage
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK [sub-heading only] (17)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (9)
- CROSS Safety Report (33)
- News [sub-heading only] (4)
CROSS regions
Inadequate design and quality assurance on a mandatory seismic retrofit project
A tenant's structural engineer discovers widespread design and related quality problems on a mandatory seismic retrofit project.
1 September 2020
CROSS Safety Report
Report ID: 986
Region: CROSS-US
Incomplete casting of composite brick/concrete parapets
A reporter states that during a parapet raising scheme over a mainline railway, a void up to 300mm deep was identified below existing coping bed level.
1 January 2018
CROSS Safety Report
Report ID: 635
Region: CROSS-UK
Unsafe removal of internal walls
A reporter was requested to advise on the removal of some internal walls in a decades’ old multi storey block of council flats after they were removed.
1 October 2018
CROSS Safety Report
Report ID: 714
Region: CROSS-UK
Parapet wall collapse
The sudden failure of parapet coping stones on an old two storey industrial building caused the stones to fall onto a road and pavement below.
1 January 2018
CROSS Safety Report
Report ID: 711
Region: CROSS-UK
Inadequate brick ties in gable walls
A reporter was called to council houses at four different sites, whose upper triangle of cavity wall brickwork on the gable end had fallen out, due to not being tied into the roof.
1 July 2019
CROSS Safety Report
Report ID: 785
Region: CROSS-UK
High winds cause masonry parapet failure
A reporter highlights how exceptionally strong winds caused a fourth-floor level masonry parapet wall with a 1.7m high timber fencing on top of it to collapse.
1 April 2019
CROSS Safety Report
Report ID: 803
Region: CROSS-UK
Dangerous design of a retaining wall
Serious errors were made in the input to a computer program used for designing a 1.8m high retaining wall.
29 March 2021
CROSS Safety Report
Report ID: 989
Region: CROSS-UK
Incorrect steel lintel installation
A reporter came across several issues, associated with the installation of steel beam lintels, while carrying out inspection works on a 1950’s domestic property.
13 December 2021
CROSS Safety Report
Report ID: 1008
Region: CROSS-UK
Inadequate modelling of existing building
An existing building suffered damage while being upgraded, which led to a more detailed inspection of the existing building’s condition. The report highlights the importance of conducting a thorough investigation and assessment of an existing building structure to ensure an understanding of how it will perform under the applied design loads, rather than relying on assumptions that may be unre...
30 March 2023
CROSS Safety Report
Report ID: 1082
Region: CROSS-AUS
Wall collapse during house demolition
A reporter describes how poor demolition practice resulted in a wall falling onto a neighbouring property.
1 April 2017
CROSS Safety Report
Report ID: 608
Region: CROSS-UK