Safety information search results
Filter your results
Building or structure type
- Bridges (33)
- Buildings
(243)
- Agricultural buildings (1)
- Car parks (11)
- Commercial (20)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (9)
- Health care (3)
- Higher-risk buildings (1)
- Industrial buildings (4)
- Public, religious & civic buildings (6)
- Recreational buildings (5)
- Residential (65)
- Stadiums (2)
- Storage buildings (3)
- Tall buildings (8)
- Theatres & other entertainment buildings (6)
- Transport buildings (2)
- Buried pipes & culverts (3)
- Freestanding walls (1)
- Masts & towers (11)
- Railways (6)
- Reservoirs & dams (1)
- Retaining structures (23)
- Roads (7)
- Sewers (4)
- Temporary structures (28)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (3)
- Design: quality management (26)
- Design calculations (28)
- Design conceptualisation (11)
- Design detailing (67)
- Design drawings (24)
- Design loads (50)
- Design software (8)
- Dynamics (4)
- Fire safety design (9)
- Resilience (6)
- Robustness (22)
- Structural design (68)
- Sustainability (2)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (22)
- Assessment project [sub-heading only] (7)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (185)
- Demolition project (4)
- Excavation (15)
- Extension project (12)
- Groundworks project (3)
- Maintenance project (2)
- New build (104)
- Refurbishment (9)
- Remediation project (13)
- Repair project (6)
- Strengthening project (4)
- Structural assessment (8)
- Underpinning project (3)
Construction period
Elements & systems
- Arch (2)
- Balconies (8)
- Balustrades (14)
- Basements (7)
- Beams (55)
- Bracing (14)
- Cables (1)
- Canopies (1)
- Ceilings (11)
- Cladding (26)
- Columns (30)
- Fasteners & connections (116)
- Fire protection (7)
- Foundations (31)
- Insulation (6)
- Light gauge steel framing (6)
- Lintels (3)
- Padstones (5)
- Parapets (5)
- PV panels (1)
- Roofs (35)
- Sandwich panels (1)
- Signs (4)
- Slabs (35)
- Tendons (1)
- Trusses (8)
- Wall head restraints (2)
- Walls (70)
- Wall ties (10)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (5)
- CROSS-AUS Newsletter 3 (4)
- CROSS-AUS Newsletter 4 (3)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS Newsletter 8 (1)
- CROSS-AUS [sub-heading only] (14)
- CROSS-UK Newsletter 1 (5)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (3)
- CROSS-UK Newsletter 4 (8)
- CROSS-UK Newsletter 5 (4)
- CROSS-UK Newsletter 6 (5)
- CROSS-UK Newsletter 7 (3)
- CROSS-UK Newsletter 8 (4)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (4)
- CROSS-UK Newsletter 11 (3)
- CROSS-UK Newsletter 12 (4)
- CROSS-UK Newsletter 13 (4)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 17 (3)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 19 (4)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 21 (4)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (4)
- CROSS-UK Newsletter 30 (7)
- CROSS-UK Newsletter 31 (5)
- CROSS-UK Newsletter 32 (6)
- CROSS-UK Newsletter 33 (4)
- CROSS-UK Newsletter 34 (6)
- CROSS-UK Newsletter 35 (6)
- CROSS-UK Newsletter 36 (3)
- CROSS-UK Newsletter 37 (5)
- CROSS-UK Newsletter 38 (6)
- CROSS-UK Newsletter 39 (5)
- CROSS-UK Newsletter 40 (3)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (9)
- CROSS-UK Newsletter 43 (5)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (4)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (7)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (5)
- CROSS-UK Newsletter 50 (4)
- CROSS-UK Newsletter 51 (5)
- CROSS-UK Newsletter 52 (6)
- CROSS-UK Newsletter 53 (3)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (6)
- CROSS-UK Newsletter 56 (5)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (7)
- CROSS-UK Newsletter 59 (6)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (2)
- CROSS-UK Newsletter 62 (4)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (3)
- CROSS-UK [sub-heading only] (241)
- CROSS-US Newsletter 1 (3)
- CROSS-US Newsletter 2 (3)
- CROSS-US Newsletter 3 (2)
- CROSS-US [sub-heading only] (6)
- CROSS Newsletter (146)
- CROSS Safety Alert (1)
- CROSS Safety Report (406)
- CROSS Topic Paper (3)
- News [sub-heading only] (47)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
- Third party article (1)
- Third party content (1)
CROSS regions
Safety concerns with twin wall system
A reporter raises safety concerns over the temporary stability of twin wall systems after they observed failures during construction.
1 April 2014
CROSS Safety Report
Report ID: 402
Region: CROSS-UK
Unsafe timber scaffolding
Concerns were raised after a reporter observed a rickety temporary scaffold that had been constructed from 4”x2” (100mm x 50mm) timbers.
1 April 2014
CROSS Safety Report
Report ID: 407
Region: CROSS-UK
Swimming pool ceiling partial collapse
Part of a ceiling above a swimming pool collapsed, injuring four people.
1 April 2015
CROSS Safety Report
Report ID: 426
Region: CROSS-UK
Failure of epoxy resin bonded anchors in concrete
A reporter expresses concern about adhesive bonded anchors after anchors failed progressively on site during a lifting operation.
1 April 2014
CROSS Safety Report
Report ID: 429
Region: CROSS-UK
Unstable site hoarding on unattended site
The reporter is aware of unsafe hoarding that surrounds a partially developed site that has been left unattended following the economic downturn.
1 January 2014
CROSS Safety Report
Report ID: 413
Region: CROSS-UK
Blockwork lateral restraint
A recent building control inspection revealed issues with basement blockwork walls restrained by wind posts.
1 January 2015
CROSS Safety Report
Report ID: 414
Region: CROSS-UK
Contractor varies structural design intention
A reporter was made aware by the building owner of an unauthorised structural alteration that had been made on site.
1 January 2015
CROSS Safety Report
Report ID: 420
Region: CROSS-UK
Failure of anchor bolts holding suspended scaffold
During the removal of a suspended scaffold, it was found that a number of the screw bolt anchors had failed.
1 July 2015
CROSS Safety Report
Report ID: 430
Region: CROSS-UK
Freezing splits galvanised SHS columns
Concerns were raised after several square hollow section members split vertically on a partially complete construction site.
1 April 2012
CROSS Safety Report
Report ID: 253
Region: CROSS-UK
Foundation base plates for tower cranes
On two different contracts it was observed that the foundation base plates for tower cranes had suffered from low compaction of the concrete on which they rest.
1 October 2011
CROSS Safety Report
Report ID: 257
Region: CROSS-UK