Safety information search results
Filter your results
Project or lifecycle stage
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 23 (7)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (28)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 3 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (14)
- CROSS Safety Report (48)
- CROSS Topic Paper (1)
- News [sub-heading only] (3)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Metal shed blown off roof
During some very gusty winds, a metal shed which had been placed on a ninth floor terrace, was blown down to the street below.
1 April 2016
CROSS Safety Report
Report ID: 536
Region: CROSS-UK
Wind damage due to unplanned cladding
A reporter describes how some of the uprights of the fencing around local tennis courts were markedly out of vertical.
1 April 2017
CROSS Safety Report
Report ID: 604
Region: CROSS-UK
Further report on freezing of water in hollow sections
A reporter has a further warning on the issue of freeze/thaw cracking following report 434 after their firm encountered a similar problem on a UK project and investigated the matter.
1 January 2017
CROSS Safety Report
Report ID: 579
Region: CROSS-UK
Square Hollow Section (SHS) expansion due to freezing
A reporter has come across problems in British Columbia (temp range -30 degrees to +40 degrees) of cracking to square hollow sections (SHS) due to the ingress of water and freezing.
1 April 2017
CROSS Safety Report
Report ID: 641
Region: CROSS-UK
Storm Barbara - loose and insecure parapet copings
A section of a roof parapet coping on a new school had been blown onto the roof of the school, having come loose from its fixing.
1 January 2018
CROSS Safety Report
Report ID: 636
Region: CROSS-UK
Inability of roller shutter doors to resist wind pressures
Concerns are raised after two sets of roller shutter doors failed within weeks of installation at winds far below the design pressures.
1 July 2017
CROSS Safety Report
Report ID: 663
Region: CROSS-UK
Who takes responsibility for preventing a failure?
After reading the safety alert on Hazard identification for structural design, a reporter shares their views how various parties involved with structural safety sometimes see their responsibilities.
1 July 2018
CROSS Safety Report
Report ID: 704
Region: CROSS-UK
Storm damage to pressed metal roof covering
A modern dwelling with two separate V-shaped roofs sustained damage to the standing seam pressed metal roof covering during two separate weather events.
23 February 2024
CROSS Safety Report
Report ID: 952
Region: CROSS-UK
Retaining wall collapses onto rail track
A retaining wall failed and collapsed onto a railway track.
1 June 2022
CROSS Safety Report
Report ID: 775
Region: CROSS-UK