Safety information search results
Filter your results
Building or structure type
- Bridges (15)
- Buildings
(129)
- Agricultural buildings (5)
- Car parks (7)
- Commercial (10)
- Education, science & art buildings (14)
- Health care (2)
- Industrial buildings (7)
- LPS buildings (2)
- Public, religious & civic buildings (5)
- Recreational buildings (4)
- Residential (22)
- Storage buildings (5)
- Tall buildings (3)
- Theatres & other entertainment buildings (6)
- Transport buildings (4)
- Buried pipes & culverts (3)
- Freestanding walls (2)
- Masts & towers (7)
- Offshore structures (1)
- Railways (3)
- Retaining structures (15)
- Roads (7)
- Sewers (3)
- Temporary structures (16)
- Tunnels (2)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (8)
- Assessment project [sub-heading only] (2)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (71)
- Demolition project (9)
- Excavation (9)
- New build (25)
- Refurbishment (5)
- Remediation project (9)
- Repair project (6)
- Strengthening project (1)
- Structural assessment (4)
- Underpinning project (1)
Method of construction
Elements & systems
- Arch (3)
- Balconies (4)
- Balustrades (6)
- Basements (1)
- Beams (19)
- Bracing (6)
- Canopies (5)
- Ceilings (19)
- Cladding (14)
- Columns (7)
- Fasteners & connections (69)
- Fire protection (1)
- Foundations (8)
- Insulation (4)
- Lintels (2)
- Padstones (2)
- Parapets (5)
- Roofs (29)
- Sandwich panels (1)
- Signs (3)
- Slabs (22)
- Tendons (1)
- Trusses (3)
- Wall head restraints (1)
- Walls (40)
- Wall ties (4)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-UK Newsletter 1 (8)
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 6 (4)
- CROSS-UK Newsletter 8 (3)
- CROSS-UK Newsletter 9 (5)
- CROSS-UK Newsletter 10 (6)
- CROSS-UK Newsletter 11 (4)
- CROSS-UK Newsletter 12 (5)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (4)
- CROSS-UK Newsletter 18 (4)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 20 (4)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 23 (7)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (3)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 31 (4)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 33 (4)
- CROSS-UK Newsletter 34 (5)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (4)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (6)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (3)
- CROSS-UK Newsletter 43 (4)
- CROSS-UK Newsletter 44 (3)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (4)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (5)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (169)
- CROSS Newsletter (81)
- CROSS Safety Report (222)
- News [sub-heading only] (30)
- Safety information from CROSS [sub-heading only] (2)
- Safety information [sub-heading only] (1)
CROSS regions
Failure of precast concrete 'L' shaped retaining wall
A recent incident occurred on a site, where a temporary precast retaining wall failed leading to a pile of clay approximately 3m high spilling through the wall.
1 July 2014
CROSS Safety Report
Report ID: 433
Region: CROSS-UK
Failure of anchor bolts holding suspended scaffold
During the removal of a suspended scaffold, it was found that a number of the screw bolt anchors had failed.
1 July 2015
CROSS Safety Report
Report ID: 430
Region: CROSS-UK
Snow sliding off industrial building roofs
A lean-to roof at lower level than the main roof of a large industrial building collapsed and ground level equipment was damaged due to a sliding snow.
1 October 2014
CROSS Safety Report
Report ID: 438
Region: CROSS-UK
Fatal wall collapse at school due to wall climbing
This report has been provided by the Health and Safety Executive (HSE) and once again highlights the potential dangers of freestanding masonry walls.
1 July 2018
CROSS Safety Report
Report ID: 447
Region: CROSS-UK
Mobile message board in strong wind
A reporter raises concerns over mobile message boards adjacent to motorways after one moved into the motorway lane in windy conditions.
1 January 2015
CROSS Safety Report
Report ID: 437
Region: CROSS-UK
Large stone panel falls from building façade
A reporter witnessed a large stone panel detach from a second floor beam and fall to the ground, narrowly missing a group of school children.
1 July 2019
CROSS Safety Report
Report ID: 467
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Precast concrete demolition
During the demolition of a tower block, a column collapsed unexpectedly.
1 March 2006
CROSS Safety Report
Report ID: 27
Region: CROSS-UK