Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 1 (2)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 23 (7)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK [sub-heading only] (40)
- CROSS Newsletter (17)
- CROSS Safety Report (52)
- News [sub-heading only] (5)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Who takes responsibility for preventing a failure?
After reading the safety alert on Hazard identification for structural design, a reporter shares their views how various parties involved with structural safety sometimes see their responsibilities.
1 July 2018
CROSS Safety Report
Report ID: 704
Region: CROSS-UK
Collapsed scaffolding
A reporter highlights how, following modest levels of snow fall in the winter, scaffolding erected in order to support a temporary roof collapsed inwards.
1 October 2019
CROSS Safety Report
Report ID: 730
Region: CROSS-UK
Inadequate brick ties in gable walls
A reporter was called to council houses at four different sites, whose upper triangle of cavity wall brickwork on the gable end had fallen out, due to not being tied into the roof.
1 July 2019
CROSS Safety Report
Report ID: 785
Region: CROSS-UK
Street sign collapse causes fatality
This report highlights the potential dangers of street signs on fixed vertical supports subject to wind loading.
1 October 2018
CROSS Safety Report
Report ID: 793
Region: CROSS-UK
Plasterwork ceiling partial collapse at railway station
A section of a ceiling cornice, plasterboard panel and lighting collapsed at a railway station landing on the floor.
1 October 2016
CROSS Safety Report
Report ID: 587
Region: CROSS-UK
Wind damage to roof with PV panels
A reporter describes how during a heavy storm a big area of roof tiles that were adjacent to PV panels blew down.
1 October 2016
CROSS Safety Report
Report ID: 590
Region: CROSS-UK
Wind damage due to unplanned cladding
A reporter describes how some of the uprights of the fencing around local tennis courts were markedly out of vertical.
1 April 2017
CROSS Safety Report
Report ID: 604
Region: CROSS-UK
Inability of roller shutter doors to resist wind pressures
Concerns are raised after two sets of roller shutter doors failed within weeks of installation at winds far below the design pressures.
1 July 2017
CROSS Safety Report
Report ID: 663
Region: CROSS-UK
Storm Barbara - loose and insecure parapet copings
A section of a roof parapet coping on a new school had been blown onto the roof of the school, having come loose from its fixing.
1 January 2018
CROSS Safety Report
Report ID: 636
Region: CROSS-UK
High winds cause masonry parapet failure
A reporter highlights how exceptionally strong winds caused a fourth-floor level masonry parapet wall with a 1.7m high timber fencing on top of it to collapse.
1 April 2019
CROSS Safety Report
Report ID: 803
Region: CROSS-UK