Safety information search results
Filter your results
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (1)
- Assessment project [sub-heading only] (1)
- Construction project [sub-heading only] (17)
- Excavation (1)
- Extension project (2)
- Groundworks project (2)
- New build (4)
- Refurbishment (2)
- Remediation project (2)
- Repair project (2)
- Strengthening project (1)
- Structural assessment (2)
Method of construction
Structural form
Elements & systems
- ACM cladding (1)
- Arch (1)
- Balconies (2)
- Balustrades (3)
- Beams (4)
- Bracing (2)
- Cables (1)
- Ceilings (4)
- Cladding (11)
- Columns (4)
- Fasteners & connections (23)
- Foundations (1)
- Insulation (1)
- Padstones (1)
- Parapets (5)
- PV panels (1)
- Roofs (24)
- Signs (2)
- Slabs (3)
- Trusses (2)
- Wall head restraints (2)
- Walls (13)
- Wall ties (4)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (2)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 8 (3)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 23 (7)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (4)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (3)
- CROSS-UK [sub-heading only] (54)
- CROSS Newsletter (27)
- CROSS Safety Alert (9)
- CROSS Safety Report (89)
- CROSS Topic Paper (1)
- News [sub-heading only] (7)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
School roof timber truss collapse
A gym/assembly hall roof to a school collapsed suddenly and without warning overnight when fortunately the building was unoccupied.
1 January 2012
CROSS Safety Report
Report ID: 249
Region: CROSS-UK
Snow loading in Scotland - summary of reports
There were heavy snowfalls over the entire United Kingdom in the winters of 2009/2010 and 2010/2011 and CROSS received a number of reports, mostly from Scotland where a significant number of buildings suffered roof collapses.
1 July 2011
CROSS Safety Report
Report ID: 264
Region: CROSS-UK
PV solar panels
This reporter queries whether enough attention is being paid to the loads applied by PV (Photo Voltaic) solar panels added to roofs.
1 January 2012
CROSS Safety Report
Report ID: 266
Region: CROSS-UK
Freezing splits galvanised SHS columns
Concerns were raised after several square hollow section members split vertically on a partially complete construction site.
1 April 2012
CROSS Safety Report
Report ID: 253
Region: CROSS-UK
Loading from solar panels
A reporter inspected a roof to discover that the structure was already overloaded with the self weight of the roof covering without the addition of solar panels.
1 January 2012
CROSS Safety Report
Report ID: 280
Region: CROSS-UK
Collapse of proprietary timber roof
A proprietary timber roof system spanning 8m over a school hall collapsed. The roof was constructed in 1959, and formed from a ply-web beam system, with hardboard ceiling and ply deck and asphalt covering.
1 January 2012
CROSS Safety Report
Report ID: 273
Region: CROSS-UK
Concern about PV installations
A reporter who has been pricing PV installations for portal frames would like to draw the attention of CROSS to concerns regarding issues that are emerging within the industry.
1 January 2012
CROSS Safety Report
Report ID: 287
Region: CROSS-UK
Pre-stressing ducts
A reporter has come across a situation where during grouting of the ducts in a slab, patches of concrete as big as 0.5m x 1m and 30mm thick fell on to the ground creating a safety hazard.
1 October 2008
CROSS Safety Report
Report ID: 89
Region: CROSS-UK
Wind on internal masonry walls during construction
There has been a generic report from a contractor about internal masonry walls during construction following his experiences of failures.
1 October 2007
CROSS Safety Report
Report ID: 82
Region: CROSS-UK
Site hoardings blow down
Investigations into timber hoarding failures by the reporter’s firm indicated that the majority of site hoardings are erected with no design whatsoever.
1 October 2007
CROSS Safety Report
Report ID: 83
Region: CROSS-UK