Safety information search results
Filter your results
Building or structure type
Building height
Materials
Products
Project or lifecycle stage
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (2)
- Assessment project [sub-heading only] (2)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (7)
- Excavation (1)
- Groundworks project (1)
- New build (2)
- Refurbishment (3)
- Remediation project (3)
- Repair project (2)
- Structural assessment (5)
Method of construction
Structural form
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (7)
- CROSS Newsletter (5)
- CROSS Safety Alert (1)
- CROSS Safety Report (22)
- News [sub-heading only] (1)
CROSS regions
Water ingress to cross-laminated timber structural frame
In an eight year old building that included cross-laminated timber construction, it was found that water penetration had caused parts of the structure to rot.
6 June 2022
CROSS Safety Report
Report ID: 1124
Region: CROSS-UK
Unsafe design of retrofit cantilever balconies
A structural assessment of a number of new balconies being added to an existing building revealed critical concerns in respect of fixings back into the existing brickwork.
26 August 2022
CROSS Safety Report
Report ID: 1128
Region: CROSS-UK
Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
Stadia crash barriers
Some hollow steel posts forming part of a crash barrier, which were only 4-5 years old, had filled with water that had caused the damage on freezing in winter.
1 February 2001
CROSS Safety Alert
Region: CROSS-UK
Rotting plywood decking on grandstand
During visual structural inspections of temporary demountable grandstands, a walkway board failed when it was walked on.
31 May 2022
CROSS Safety Report
Report ID: 1092
Region: CROSS-UK
Corrosion concerns on a pedestrian bridge
A reporter is concerned about a pedestrian bridge that may have reduced load capacity due to corrosion at the root of cantilever supports.
17 February 2023
CROSS Safety Report
Report ID: 1161
Region: CROSS-UK
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Freeze/thaw effects on RHSs and unexpected hydrogen generation
A reporter provides their views of the freezing effects on rectangular hollow sections (RHSs) and how this could be related to Liquid Metal Assisted Cracking.
1 October 2014
CROSS Safety Report
Report ID: 434
Region: CROSS-UK
Further report on freezing of water in hollow sections
A reporter has a further warning on the issue of freeze/thaw cracking following report 434 after their firm encountered a similar problem on a UK project and investigated the matter.
1 January 2017
CROSS Safety Report
Report ID: 579
Region: CROSS-UK
Further issues with freezing and galvanised hollow sections
A reporter was involved in correcting a cold formed galvanised square hollow section (SHS) four storey balcony structure where longitudinal splits formed in at least two of the four columns.
1 January 2014
CROSS Safety Report
Report ID: 314
Region: CROSS-UK