Safety information search results
Filter your results
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Elements & systems
- Arch (1)
- Balconies (1)
- Balustrades (4)
- Basements (2)
- Beams (7)
- Bracing (2)
- Canopies (1)
- Ceilings (2)
- Cladding (10)
- Columns (6)
- Fasteners & connections (23)
- Fences (1)
- Fire exit doors (1)
- Fire protection (2)
- Foundations (5)
- Insulation (1)
- Light gauge steel framing (3)
- Lintels (1)
- Padstones (1)
- Parapets (2)
- PV panels (1)
- Roofs (12)
- Shear walls (1)
- Slabs (6)
- Trusses (3)
- Walls (12)
- Wall ties (2)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 5 (4)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (8)
- CROSS-UK Newsletter 64 (3)
- CROSS-UK Newsletter 67 (4)
- CROSS-UK Newsletter 68 (1)
- CROSS-US Newsletter 3 (5)
- CROSS Newsletter (8)
- (-) CROSS Safety Report (108)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (2)
CROSS regions
Overall stability of building proposed to be provided by metal framing and plasterboard
Metal framing and plasterboard was used to provide lateral stability to a building. The form of construction was later deemed to be unsuitable and extensive remedial works had to be carried out.
24 May 2023
CROSS Safety Report
Report ID: 468
Region: CROSS-UK
Collapse of brick arch overbridge during demolition
A reporter describes a project where a flanking brick arch collapsed during the demolition of two multi-span bridges over rail lines.
30 June 2022
CROSS Safety Report
Report ID: 573
Region: CROSS-UK
Failure of cast-in wire lifting loops on manhole cover slabs
A cast-in wire lifting loop failed when lifting a 4m diameter precast manhole cover slab into place.
23 May 2022
CROSS Safety Report
Report ID: 629
Region: CROSS-UK
Behaviour of Phase Change Materials in fire when incorporated in linings in buildings
A reporter raised a concern regarding the perception and use of products that incorporate Phase Change Materials (PCMs).
24 May 2023
CROSS Safety Report
Report ID: 698
Region: CROSS-UK
Fatigue failure of bridge cross-girder
During a planned examination of a bridge, a cross-girder was found to have failed via fatigue.
23 May 2022
CROSS Safety Report
Report ID: 743
Region: CROSS-UK
Corrosion of main girder beam on bridge supporting rail lines
A hole was found in the central main girder on a bridge supporting rail line during inspection works.
23 May 2022
CROSS Safety Report
Report ID: 745
Region: CROSS-UK
Corrosion of steel truss footbridge
Severe corrosion was found in a steel truss footbridge during a planned examination.
23 May 2022
CROSS Safety Report
Report ID: 774
Region: CROSS-UK
Retaining wall collapses onto rail track
A retaining wall failed and collapsed onto a railway track.
1 June 2022
CROSS Safety Report
Report ID: 775
Region: CROSS-UK
Failure of vertical bracing system in coffee shop
A reporter noticed that a bolt at a low level connecting node of the vertical bracing system in a public building had failed.
30 June 2022
CROSS Safety Report
Report ID: 759
Region: CROSS-UK
Dangerous defects in curtain wall glazing
This report concerns a 5m high vertical glazing system in which the fixings for a panel failed after only four years because of a lack of co-ordination between designers and contractors.
6 April 2023
CROSS Safety Report
Report ID: 762
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.