Safety information search results
Filter your results
Building or structure type
- Bridges (10)
- Buildings
(70)
- Car parks (6)
- Commercial (4)
- Education, science & art buildings (3)
- Health care (1)
- Industrial buildings (1)
- Public, religious & civic buildings (4)
- Recreational buildings (3)
- Residential (15)
- Storage buildings (1)
- Tall buildings (2)
- Theatres & other entertainment buildings (3)
- Transport buildings (2)
- Buried pipes & culverts (1)
- Freestanding walls (1)
- Masts & towers (5)
- Retaining structures (12)
- Roads (3)
- Sewers (2)
- Temporary structures (13)
Materials
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Project type
- Alteration & conversion project (6)
- Assessment project [sub-heading only] (1)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (52)
- Demolition project (1)
- Excavation (9)
- New build (25)
- Refurbishment (3)
- Remediation project (5)
- Repair project (3)
- Structural assessment (2)
- Underpinning project (1)
Method of construction
Elements & systems
- Arch (2)
- Balconies (3)
- Balustrades (4)
- Basements (1)
- Beams (13)
- Bracing (4)
- Canopies (1)
- Ceilings (8)
- Cladding (8)
- Columns (2)
- Fasteners & connections (43)
- Foundations (7)
- Insulation (1)
- Lintels (1)
- Padstones (2)
- Parapets (1)
- Roofs (11)
- Signs (2)
- Slabs (15)
- Tendons (1)
- Trusses (2)
- Wall head restraints (1)
- Walls (26)
- Wall ties (3)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-UK Newsletter 1 (3)
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (3)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (3)
- CROSS-UK Newsletter 11 (3)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (3)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 31 (4)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 33 (3)
- CROSS-UK Newsletter 34 (4)
- CROSS-UK Newsletter 35 (3)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 38 (6)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (3)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK [sub-heading only] (102)
- CROSS Newsletter (55)
- CROSS Safety Report (133)
- News [sub-heading only] (21)
CROSS regions
Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
Failure of cantilevered stone staircase
During the renovation and change-of-use conversion of a former minor stately home built around 1830, under pedestrian loading, a ‘cantilevered’ stone staircase partially collapsed without warning.
21 February 2023
CROSS Safety Report
Report ID: 1147
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Near collapse of masonry highway bridge
Works adjacent to a masonry arch bridge caused the foundations to subside and damage the bridge beyond repair.
1 October 2012
CROSS Safety Report
Report ID: 286
Region: CROSS-UK
Failed two storey retaining wall
A two storey high retaining wall adjacent to a house collapsed.
1 October 2011
CROSS Safety Report
Report ID: 240
Region: CROSS-UK
Freezing splits galvanised SHS columns
Concerns were raised after several square hollow section members split vertically on a partially complete construction site.
1 April 2012
CROSS Safety Report
Report ID: 253
Region: CROSS-UK
Steel connector failures and forged certificates
According to a reporter, some suppliers are receiving components that are accompanied by certificates that are potentially false or forged.
1 July 2012
CROSS Safety Report
Report ID: 254
Region: CROSS-UK
Collapse of a hollow core unit
This refers to the collapse of one modest span precast hollow core concrete unit and the excessive deflection of others on a building which was under construction.
1 October 2012
CROSS Safety Report
Report ID: 258
Region: CROSS-UK
Multi-storey car parks - structural condition concerns
A reporter raises concerns about the structural condition of a number of car parks that they have worked on as remediation projects.
1 April 2012
CROSS Safety Report
Report ID: 265
Region: CROSS-UK
Hoarding incident
A reporter says that under high, but not severe, wind loads a portion of timber hoarding failed and struck site personnel.
1 July 2013
CROSS Safety Report
Report ID: 278
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.