Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK [sub-heading only] (10)
- CROSS-US Newsletter 1 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (5)
- CROSS Safety Report (18)
- News [sub-heading only] (2)
CROSS regions
Object rolling into live carriageway
A disc of concrete rolled from a construction area onto a live carriageway, colliding with a passing vehicle.
6 June 2022
Report ID: 1089
Region: CROSS-UK
Deficiencies on access scaffold
Investigation by a reporter’s firm into an access scaffold on a refurbishment contract on a city centre site brought to light a number of deficiencies which rendered the scaffold out with its design parameters.
1 April 2011
CROSS Safety Report
Report ID: 219
Region: CROSS-UK
Defective imported scaffold ties
On a contract where multi lift access scaffolds had been installed for a period of up to 18 months in an exposed coastal location, it was found by a reporter on one of the regular inspections that some of the scaffold ties had failed.
1 April 2011
CROSS Safety Report
Report ID: 230
Region: CROSS-UK
Polyethylene pipework handrails
A reporter raises concerns about the use of polyethylene pipework being used as handrails on sites.
1 October 2013
CROSS Safety Report
Report ID: 373
Region: CROSS-UK
Unsafe working platform
A reporter came across an access platform supported next to an excavated foundation with unstable sides while carrying out an inspection on site.
10 March 2022
CROSS Safety Report
Report ID: 1019
Region: CROSS-UK
Injuries from falling scaffold tube
Two children received injuries when a scaffold tube fell from height.
1 July 2016
CROSS Safety Report
Report ID: 571
Region: CROSS-UK
Casting, transporting and installing precast concrete kerbs
A reporter shares their experience of how collaborative engineering thinking involving several parties enabled a design solution to be found that could be constructed safely.
1 October 2018
CROSS Safety Report
Report ID: 778
Region: CROSS-UK
Serious safety failings of high level lattice girder walkways
A reporter discusses extremely serious safety failings with the construction of two new high level lattice girder walkways in the fly tower of a theatre.
1 January 2018
CROSS Safety Report
Report ID: 697
Region: CROSS-UK
Designed scaffold built incorrectly
A Temporary Works Coordinator (TWC) found that scaffolding was not constructed in accordance with the approved design drawings and a number of unauthorised modifications had been made.
1 January 2018
CROSS Safety Report
Report ID: 701
Region: CROSS-UK
Scaffold lifting beams incorrectly installed
During the inspection of scaffolding prior to loading, it was observed that there were lifting beams with end stops and ultimate stop cross bolts incorrectly installed.
1 January 2018
CROSS Safety Report
Report ID: 702
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.