Safety information search results
Filter your results
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (20)
- CROSS Newsletter (11)
- CROSS Safety Report (31)
- News [sub-heading only] (6)
CROSS regions
Accidental partial demolition of a beam
During a site visit, the permanent works design engineer noticed that hydro-demolition of the end of a floor supporting beam had taken place out of sequence. This introduced a pattern of bending moments and shear forces that were not considered in the original design.
6 April 2023
CROSS Safety Report
Report ID: 855
Region: CROSS-UK
Temporary instability of columns
Concerns were raised by a reporter on the temporary stability of concrete columns during construction.
2 February 2023
CROSS Safety Report
Report ID: 872
Region: CROSS-UK
Unsafe working platform
A reporter came across an access platform supported next to an excavated foundation with unstable sides while carrying out an inspection on site.
10 March 2022
CROSS Safety Report
Report ID: 1019
Region: CROSS-UK
Unsafe excavation practices
A builder undermined the existing footing of a masonry wall without being aware of the risks.
30 July 2021
CROSS Safety Report
Report ID: 1026
Region: CROSS-UK
Split responsibilities on temporary bracing of steelwork
A contractor removed temporary bracing on site prior to the structure being in a permanent stable state.
1 July 2010
CROSS Safety Report
Report ID: 204
Region: CROSS-UK
Need for licensed builders
A reporter feels certain building work should only be carried out by licensed qualified builders.
1 January 2011
CROSS Safety Report
Report ID: 214
Region: CROSS-UK
Lack of control on site when underpinning
The concern is in relation to the sequencing of construction and the lack of control on site from competent persons during underpinning works.
1 October 2011
CROSS Safety Report
Report ID: 241
Region: CROSS-UK
Dangerous modification to a column
A reporter was requested to visit a warehouse to inspect work carried out to a main support column that had been modified by a builder.
1 July 2010
CROSS Safety Report
Report ID: 169
Region: CROSS-UK
Concerns on stability require prompt action
A reporter was concerned about overall building stability during an extension and conversion project.
1 January 2010
CROSS Safety Report
Report ID: 171
Region: CROSS-UK
Collapse of a hollow core unit
This refers to the collapse of one modest span precast hollow core concrete unit and the excessive deflection of others on a building which was under construction.
1 October 2012
CROSS Safety Report
Report ID: 258
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.