Safety information search results
Filter your results
Building or structure type
- Bridges (7)
- (-)
Buildings
(156)
- Car parks (4)
- Commercial (10)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (9)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (3)
- Public, religious & civic buildings (5)
- Recreational buildings (5)
- Residential (45)
- Stadiums (2)
- Storage buildings (3)
- Tall buildings (4)
- Theatres & other entertainment buildings (6)
- Transport buildings (3)
- Retaining structures (3)
- Temporary structures (3)
Building height
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (15)
- Construction project [sub-heading only] (84)
- Demolition project (2)
- Excavation (3)
- Extension project (5)
- Maintenance project (2)
- New build (49)
- Refurbishment (5)
- Remediation project (6)
- Repair project (3)
- Strengthening project (4)
- Structural assessment (2)
- Underpinning project (3)
Method of construction
Elements & systems
- Balconies (4)
- Balustrades (5)
- Basements (5)
- Beams (22)
- Bracing (6)
- Canopies (1)
- Ceilings (13)
- Cladding (16)
- Columns (16)
- Fasteners & connections (57)
- Fire protection (3)
- Foundations (13)
- Insulation (2)
- Light gauge steel framing (3)
- Lintels (2)
- Padstones (3)
- Parapets (2)
- Roofs (16)
- Sandwich panels (1)
- Shear walls (2)
- Signs (1)
- Slabs (15)
- Trusses (5)
- Wall head restraints (3)
- Walls (31)
- Wall ties (9)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 6 (3)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 10 (6)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (3)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (3)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (4)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (3)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (4)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (84)
- CROSS-US Newsletter 1 (2)
- CROSS-US Newsletter 2 (4)
- CROSS-US Newsletter 3 (3)
- CROSS-US [sub-heading only] (6)
- CROSS Newsletter (47)
- CROSS Safety Report (156)
- News [sub-heading only] (16)
CROSS regions
Collapse of a hollow core unit
This refers to the collapse of one modest span precast hollow core concrete unit and the excessive deflection of others on a building which was under construction.
1 October 2012
CROSS Safety Report
Report ID: 258
Region: CROSS-UK
Inadequate foundation reinforcement
Subcontractors carrying out the ground works for a multi-storey development failed to provide sufficient continuity reinforcement in the ground beams.
1 October 2008
CROSS Safety Report
Report ID: 112
Region: CROSS-UK
Shop/domestic building collapse
A two storey corner (end of terrace) property fronting a very busy, narrow major route collapsed during the construction of a new basement.
1 January 2009
CROSS Safety Report
Report ID: 123
Region: CROSS-UK
Concrete half joints
Poor reinforcement detailing and installation in a half joint led to the collapse of a series of beams and precast concrete slabs.
1 January 2008
CROSS Safety Report
Report ID: 88
Region: CROSS-UK
Pre-stressing ducts
A reporter has come across a situation where during grouting of the ducts in a slab, patches of concrete as big as 0.5m x 1m and 30mm thick fell on to the ground creating a safety hazard.
1 October 2008
CROSS Safety Report
Report ID: 89
Region: CROSS-UK
Further demolition collapse
This report is of an incident that occurred recently in a UK city when a floor suffered a structural collapse during the demolition of a reinforced concrete building.
1 January 2008
CROSS Safety Report
Report ID: 90
Region: CROSS-UK
Car park staircase collapse at construction joint
The top flight of a staircase to a multi-storey concrete car park collapsed approximately 10 years after construction.
1 July 2008
CROSS Safety Report
Report ID: 106
Region: CROSS-UK
Wind damage to gable wall
Following request for examples of wind damage this collapse was reported of the external brick skin of gable wall of a two storey timber frame terraced house.
1 April 2007
CROSS Safety Report
Report ID: 78
Region: CROSS-UK
Collapse of a wall during construction
An internal corridor wall collapsed in a school under construction.
1 April 2008
CROSS Safety Report
Report ID: 99
Region: CROSS-UK
Ceiling collapse in cinema due to fixing failures
A number of fixings of a ceiling support system pulled out setting up a cascade reaction such that the whole ceiling fell down.
1 April 2008
CROSS Safety Report
Report ID: 103
Region: CROSS-UK