Safety information search results
Filter your results
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (18)
- (-) CROSS Newsletter (18)
- CROSS Safety Report (18)
- (-) News [sub-heading only] (18)
CROSS regions
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Inadequate structural design on industrial steel structures
A reporter's firm believes that steel structures associated with plant are being erected without a design being carried out by a structural engineer and are therefore potentially dangerous.
1 April 2019
CROSS Safety Report
Report ID: 804
Region: CROSS-UK
Fixing brackets for glazing systems
A reporter's organisation has been alerted to several cases of broken glass panels in a canopy at a transportation facility.
1 January 2019
CROSS Safety Report
Report ID: 802
Region: CROSS-UK
High winds cause masonry parapet failure
A reporter highlights how exceptionally strong winds caused a fourth-floor level masonry parapet wall with a 1.7m high timber fencing on top of it to collapse.
1 April 2019
CROSS Safety Report
Report ID: 803
Region: CROSS-UK
Roof constructed without structural input
A reporter wants to highlight the problem of builders working off plans provided by an architect or surveyor and assuming that section sizes shown on their drawings are structurally adequate.
1 January 2016
CROSS Safety Report
Report ID: 515
Region: CROSS-UK
Fibrous plaster ceiling features
This recent report of a serious concern about an old fibrous plaster ceiling has similarities to the Apollo Theatre ceiling collapse in London in December 2013.
1 July 2015
CROSS Safety Report
Report ID: 518
Region: CROSS-UK
Swimming pool ceiling partial collapse
Part of a ceiling above a swimming pool collapsed, injuring four people.
1 April 2015
CROSS Safety Report
Report ID: 426
Region: CROSS-UK
Safety concerns with twin wall system
A reporter raises safety concerns over the temporary stability of twin wall systems after they observed failures during construction.
1 April 2014
CROSS Safety Report
Report ID: 402
Region: CROSS-UK
Partial roof collapse at shopping centre
There was a recent partial roof collapse at a shopping centre which was, says the reporter, built in the early 1970s in a form which may have been used extensively throughout the UK during this period and possibly beyond.
1 October 2013
CROSS Safety Report
Report ID: 395
Region: CROSS-UK
Weld de-specification without design approval
A reporter's firm was engaged as fabricators for a main contractor and asked by them to de-specify full and partial penetration butt welds and replace them with fillet welds without approval from the main design engineer.
14 October 2020
CROSS Safety Report
Report ID: 845
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.