Safety information search results
Filter your results
Building or structure type
- (-)
Buildings
(62)
- Agricultural buildings (6)
- Commercial (5)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (2)
- Industrial buildings (3)
- Public, religious & civic buildings (4)
- Recreational buildings (1)
- Residential (12)
- Stadiums (1)
- Storage buildings (4)
- Tall buildings (2)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 20 (3)
- CROSS-UK Newsletter 23 (4)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (3)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (3)
- (-) CROSS-UK [sub-heading only] (62)
- CROSS Newsletter (39)
- CROSS Safety Report (62)
- News [sub-heading only] (15)
CROSS regions
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Facade failure
Large pieces of granite fell without warning from a second floor opening.
1 February 2007
CROSS Safety Report
Report ID: 63
Region: CROSS-UK
Failure of blind bolts
There was a partial collapse of a steel frame building due to the failure of some blind bolts during the construction period. Loads at the time were well below anticipated failure levels.
1 April 2007
CROSS Safety Report
Report ID: 71
Region: CROSS-UK
Design of head track in cold formed steel framing
The reporter noticed that the in-house structural engineer for the steel frame company had not taken account of all the loads in the design of the head track.
1 November 2006
CROSS Safety Report
Report ID: 39
Region: CROSS-UK
Balustrades in public buildings
A reporter had a concern regarding a timber balustrade in a showroom.
1 February 2007
CROSS Safety Report
Report ID: 61
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Steel portal frame erection
A reporter describes how a steel portal frame collapsed during its erection.
1 March 2006
CROSS Safety Report
Report ID: 20
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Proper design and use of cold rolled steel frames
A reporter has been designing structures in cold rolled steel for approximately twenty years, mainly portal frame buildings, and some concerns.
1 January 2008
CROSS Safety Report
Report ID: 93
Region: CROSS-UK
Dangerous modification to a column
A reporter was requested to visit a warehouse to inspect work carried out to a main support column that had been modified by a builder.
1 July 2010
CROSS Safety Report
Report ID: 169
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.