Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (6)
- CROSS Newsletter (4)
- CROSS Safety Report (10)
- News [sub-heading only] (1)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Further example of incorrect finite element modelling
Concerns in respect of the sufficiency of finite element modelling of masonry walls as part of a reinforced concrete framed building.
20 February 2023
CROSS Safety Report
Report ID: 1145
Region: CROSS-UK
Concerns over corrosion of dissimilar metals in fixing cavity wall tie systems
A reporter is concerned about corrosion that may occur between dissimilar metals that can be used in cavity wall tie systems. The reporter has noted that stainless steel and carbon steel may be fixed together in wall cavities, which are damp environments, and that corrosion of dissimilar metals in contact may occur.
24 May 2023
CROSS Safety Report
Report ID: 1186
Region: CROSS-UK
Incorrect steel lintel installation
A reporter came across several issues, associated with the installation of steel beam lintels, while carrying out inspection works on a 1950’s domestic property.
13 December 2021
CROSS Safety Report
Report ID: 1008
Region: CROSS-UK
Design of head track in cold formed steel framing
The reporter noticed that the in-house structural engineer for the steel frame company had not taken account of all the loads in the design of the head track.
1 November 2006
CROSS Safety Report
Report ID: 39
Region: CROSS-UK
Snow loading in Scotland - collapsed warehouses
A reporter provided a list of 40 whisky warehouse buildings that had collapsed in the recent heavy snow conditions in northern Scotland (January/February 2010).
1 July 2011
CROSS Safety Report
Report ID: 193
Region: CROSS-UK
Contractor uses incorrect fixing bolts for masonry support angles
A correspondent noticed that proprietary masonry support angles specified to support the outer leaf of masonry had been incorrectly connected to the steel beam using carriage bolts.
1 July 2019
CROSS Safety Report
Report ID: 794
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Unauthorised alterations to Light Gauge Steel Framing on site
Concerns were raised after Light Gauge Steel Framing (LGSF) acting as a structural system was trimmed locally on site to accommodate the installation of balcony brackets without approval from the design team.
1 July 2018
CROSS Safety Report
Report ID: 669
Region: CROSS-UK
Inadequate structural design for domestic properties
A reporter has recently been asked to redesign several projects for domestic extensions/alterations, where two structural problems were found.
1 January 2018
CROSS Safety Report
Report ID: 703
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.