Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Project type
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (10)
- CROSS Newsletter (5)
- CROSS Safety Report (24)
CROSS regions
Temporary instability of columns
Concerns were raised by a reporter on the temporary stability of concrete columns during construction.
2 February 2023
CROSS Safety Report
Report ID: 872
Region: CROSS-UK
Punching shear design spreadsheets
This is a technical note from a reporter about the methods their firm uses for punching shear design because there was concern about punching shear design spreadsheets possibly leading to potentially unsafe situations. .
28 March 2023
CROSS Safety Report
Report ID: 830
Region: CROSS-UK
Permanent formwork to slabs
Concerns are raised over deflection issues that are not being considered when using permanent formwork.
1 January 2011
CROSS Safety Report
Report ID: 215
Region: CROSS-UK
Compatibility at RC column to slab joint - strong column/weak slab
A reporter who was reviewing the structural design of a commercial building raises concerns over the compatibility at column/slab joints when different grades of concrete are used.
1 April 2012
CROSS Safety Report
Report ID: 296
Region: CROSS-UK
Safety issues with composite metal deck floors
A contractor had a near miss when pouring a concrete slab with permanent formwork.
1 January 2012
CROSS Safety Report
Report ID: 288
Region: CROSS-UK
Pre-stressing ducts
A reporter has come across a situation where during grouting of the ducts in a slab, patches of concrete as big as 0.5m x 1m and 30mm thick fell on to the ground creating a safety hazard.
1 October 2008
CROSS Safety Report
Report ID: 89
Region: CROSS-UK
Further demolition collapse
This report is of an incident that occurred recently in a UK city when a floor suffered a structural collapse during the demolition of a reinforced concrete building.
1 January 2008
CROSS Safety Report
Report ID: 90
Region: CROSS-UK
Car park staircase collapse at construction joint
The top flight of a staircase to a multi-storey concrete car park collapsed approximately 10 years after construction.
1 July 2008
CROSS Safety Report
Report ID: 106
Region: CROSS-UK
Precast joint failures
A reporter is interested in CROSS’s evidence about joint failures in concrete. They feel that the same failures keep arising from similar circumstances with none of the lessons having been learnt.
1 July 2008
CROSS Safety Report
Report ID: 107
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.