Safety information search results
Filter your results
Building or structure type
- Buildings
(136)
- Agricultural buildings (2)
- Car parks (2)
- Commercial (15)
- Education, science & art buildings (10)
- Health care (10)
- Higher-risk buildings (6)
- Industrial buildings (5)
- Laboratory buildings (1)
- LPS buildings (2)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (4)
- Recreational buildings (5)
- (-) Residential (138)
- Stadiums (1)
- Tall buildings (12)
- Theatres & other entertainment buildings (3)
- Transport buildings (2)
- Railways (1)
- Retaining structures (2)
- Temporary structures (1)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (25)
- Assessment project [sub-heading only] (3)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (61)
- Demolition project (1)
- Excavation (3)
- Extension project (14)
- Fire safety assessment (1)
- Maintenance project (2)
- New build (27)
- Refurbishment (9)
- Remediation project (10)
- Repair project (3)
- Strengthening project (4)
- Structural assessment (4)
- Underpinning project (3)
Method of construction
Elements & systems
- Balconies (8)
- Balustrades (5)
- Basements (4)
- Beams (21)
- Bracing (5)
- Canopies (2)
- Ceilings (1)
- Cladding (6)
- Columns (10)
- Fasteners & connections (19)
- Fire protection (5)
- Foundations (5)
- Insulation (4)
- Light gauge steel framing (3)
- Lintels (3)
- Padstones (4)
- PV panels (1)
- Roofs (14)
- Shear walls (3)
- Slabs (7)
- Trusses (2)
- Wall head restraints (1)
- Walls (30)
- Wall ties (3)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (3)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 21 (3)
- CROSS-UK Newsletter 23 (2)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (3)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 64 (5)
- CROSS-UK Newsletter 65 (5)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (5)
- CROSS-UK [sub-heading only] (57)
- CROSS-US Newsletter 2 (3)
- CROSS-US [sub-heading only] (2)
- CROSS Feature Article (1)
- CROSS Newsletter (41)
- CROSS Safety Report (137)
- News [sub-heading only] (10)
CROSS regions
Apparently simple home improvement work leads to dangerous situation
Apparently simple home improvement work, consisting of reroofing and a loft conversion, resulted in a 'near miss' with potentially dangerous conditions for neighbours.
21 August 2023
CROSS Safety Report
Report ID: 1173
Region: CROSS-UK
'Design' for alterations to a dwelling carried out by an unsuitable person
A reporter was called upon to review a design for the removal of a loadbearing wall during the refurbishment of a residence. A builder was already on site but had stopped work since they considered the engineering design to be unsatisfactory and the structural designer was not responding to their queries. The reporter found that the structural design being followed was far from competent.
21 August 2023
CROSS Safety Report
Report ID: 1236
Region: CROSS-UK
Poorly applied external insulation on buildings
This report concerns external insulation on buildings being inadequately applied and fixed, with poor control of the workmanship standards, leading to potential safety concerns and damage to the property.
21 August 2023
CROSS Safety Report
Report ID: 1203
Region: CROSS-UK
Combustible cladding material ignited during remediation work
Damage to combustible insulation on the external walls of a high rise residential premises was noticed from apparent combustion within the EPS element.
21 August 2023
CROSS Safety Report
Report ID: 1222
Region: CROSS-UK
Inadequate fire stopping around cables and other penetrations
A reporter observed inadequate fire stopping due to both ineffective installation or damage caused by follow on trades.
21 August 2023
CROSS Safety Report
Report ID: 1201
Region: CROSS-UK
Fire involving fluorescent light fitting
A fire involving a fluorescent light fitting occurred in a corridor in a sheltered housing complex.
21 August 2023
CROSS Safety Report
Report ID: 1157
Region: CROSS-UK
Incompetent design of simple steel beams
This report concerns designs for simple steel beams submitted to building control bodies under Part A of the Building Regulations. The reporter, a checking engineer for a building control body, was not able to accept the effective length and restraints assumed in a number of submitted designs. Most originated from individuals who used proprietary structural design computer packages without, i...
24 May 2023
CROSS Safety Report
Report ID: 1183
Region: CROSS-UK
Fire safety concerns for partially occupied Higher Risk Residential Buildings
Fire authority checks found several safety failings in partially occupied Higher Risk Residential Buildings.
24 May 2023
CROSS Safety Report
Report ID: 1169
Region: CROSS-UK
Design criteria for firefighting lifts
A reporter is of the opinion that the design criteria for firefighting lifts should be re-evaluated.
24 May 2023
CROSS Safety Report
Report ID: 1182
Region: CROSS-UK
The misuse of standard details and notes on structural drawings
This report draws attention to the excessive and incorrect use of standard details and notes on structural drawings, as well as the assumption that the builder/contractor will somehow work out the designer's intention of these on site. Inadequate or conflicting design and documentation can potentially lead to failures.
30 March 2023
CROSS Safety Report
Report ID: 1133
Region: CROSS-AUS
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.