Safety information search results
Filter your results
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (6)
- Assessment project [sub-heading only] (2)
- Construction project [sub-heading only] (16)
- Extension project (4)
- Fire safety assessment (1)
- Maintenance project (1)
- New build (9)
- Refurbishment (2)
- Remediation project (4)
- Strengthening project (1)
- Structural assessment (1)
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (3)
- CROSS-UK Newsletter 65 (4)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (5)
- CROSS-UK [sub-heading only] (17)
- CROSS Newsletter (16)
- CROSS Safety Report (64)
- News [sub-heading only] (4)
CROSS regions
Inadequate punching shear reinforcement in flat slabs
This report highlights how remedial works were required in a number of residential buildings after inadequate punching shear reinforcement was identified.
14 October 2020
CROSS Safety Report
Report ID: 950
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Poor quality of construction and lack of supervision on a block of flats
Concerns are raised over poor quality construction and a lack of supervision on a residential block of flats.
1 July 2017
CROSS Safety Report
Report ID: 672
Region: CROSS-UK
Roof tiles falling from height
A reporter describes how a skip turned upside down at high level and the contents crashed down onto the pavement.
1 October 2019
CROSS Safety Report
Report ID: 677
Region: CROSS-UK
Dangerous modification during construction of five storey block of flats
A reporter was asked to investigate a five storey timber framed block of flats after the leaseholder of the top floor reported gaps appearing between oak floorboards.
1 January 2018
CROSS Safety Report
Report ID: 699
Region: CROSS-UK
Polyethylene core cladding panels on a high-rise building
A reporter has raised concerns based on a past visit to a residential tower block in 2011 that had a similar type of rainscreen panel to the one used on the Grenfell Tower.
1 July 2017
CROSS Safety Report
Report ID: 682
Region: CROSS-UK
Unsafe removal of internal walls
A reporter was requested to advise on the removal of some internal walls in a decades’ old multi storey block of council flats after they were removed.
1 October 2018
CROSS Safety Report
Report ID: 714
Region: CROSS-UK
Dangerous glass infill panels on balustrade
A reporter has expressed their concern about the structural stability of cantilever glass infill panels between a steel post and handrail balustrade system at a high-level apartment block.
1 January 2019
CROSS Safety Report
Report ID: 741
Region: CROSS-UK
Fire hazards in historical modular timber framed buildings
A reporter has raised fire safety concerns suggesting the potential existence of a systemic issue pertaining to the design and construction of modular timber frame systems.
20 February 2024
CROSS Safety Report
Report ID: 1243
Region: CROSS-UK
Dangerous alteration work results in two terraced houses being demolished
Two mid terrace properties forming four flats had been underpinned and excavated to form a new basement whilst simultaneously removing internal and rear walls. This left the building in a dangerous condition and subject to a demolition order from the local council.
20 February 2024
CROSS Safety Report
Report ID: 1274
Region: CROSS-UK