Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK [sub-heading only] (10)
- CROSS Newsletter (6)
- CROSS Safety Report (11)
- News [sub-heading only] (2)
CROSS regions
Issues for CDM co-ordinators
A reporter feels that a lack of finance is being invested in the long-term maintenance for structures and that this is a difficult issue for the CDM co-ordinator to raise with the client.
1 January 2009
CROSS Safety Report
Report ID: 118
Region: CROSS-UK
Advice wanted by amateur builder
This notice, seen by a reporter, was posted on a DIY website, and whilst it may be apocryphal, it illustrates the type of queries received by local authorities and building regulations officers.
1 January 2009
CROSS Safety Report
Report ID: 125
Region: CROSS-UK
Bridge component failures
A reporter raises their concerns that not enough thought is being given to structural redundancy and buildability for bridges.
1 July 2009
CROSS Safety Report
Report ID: 141
Region: CROSS-UK
Concerns on stability require prompt action
A reporter was concerned about overall building stability during an extension and conversion project.
1 January 2010
CROSS Safety Report
Report ID: 171
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Principal designers’ obligations for temporary works
A correspondent believes that the new BS5975 standard places some onerous temporary work duties on the principal designer.
1 January 2020
CROSS Safety Report
Report ID: 870
Region: CROSS-UK
Consequences of low professional fees
An engineer believes that despite public concerns about workmanship issues on site, low professional fees mean that engineers are not able to adequately check the work on site.
1 July 2020
CROSS Safety Report
Report ID: 905
Region: CROSS-UK
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK
Ensuring CDM safety files are transferred after change of ownership
Concerns are raised that there is no effective system in place to ensure CDM safety files are passed on to new owners when properties change hands.
1 January 2017
CROSS Safety Report
Report ID: 581
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.