Safety information search results
Filter your results
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 10 (2)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (1)
- (-) CROSS-UK [sub-heading only] (25)
- CROSS Newsletter (7)
- CROSS Safety Report (25)
- News [sub-heading only] (3)
CROSS regions
Removal of internal structure
The roof trusses, 6m above the ground floor, had been left supported on props made by nailing floor joists together; one at each party wall position.
1 July 2006
CROSS Safety Report
Report ID: 46
Region: CROSS-UK
Wind damage to gable wall
Following request for examples of wind damage this collapse was reported of the external brick skin of gable wall of a two storey timber frame terraced house.
1 April 2007
CROSS Safety Report
Report ID: 78
Region: CROSS-UK
Adapted masonry support props
A reporter has come across adapted masonry support props in use and in their view, they must only be used in the case of limited openings where the masonry can arch over.
1 November 2006
CROSS Safety Report
Report ID: 57
Region: CROSS-UK
Adapted masonry support props
Another reporter gives their experience on the use of adapted masonry support props.
1 November 2006
CROSS Safety Report
Report ID: 58
Region: CROSS-UK
Collapse of brickwork cladding
The external leaf of a brickwork pier at first floor level fell down onto the playground of a school adjacent to the main entrance door.
1 October 2007
CROSS Safety Report
Report ID: 84
Region: CROSS-UK
Collapse of a wall during construction
An internal corridor wall collapsed in a school under construction.
1 April 2008
CROSS Safety Report
Report ID: 99
Region: CROSS-UK
Collapse of a gable wall
Part of a gable wall to a fairly recently constructed block of flats collapsed onto a parked car which suffered significant damage.
1 April 2008
CROSS Safety Report
Report ID: 92
Region: CROSS-UK
Lifting bolt failure
A major contractor reported an incident that had occurred in which a threaded eyebolt failed during an operation to lift a section of stonework into place.
1 July 2008
CROSS Safety Report
Report ID: 110
Region: CROSS-UK
Advice wanted by amateur builder
This notice, seen by a reporter, was posted on a DIY website, and whilst it may be apocryphal, it illustrates the type of queries received by local authorities and building regulations officers.
1 January 2009
CROSS Safety Report
Report ID: 125
Region: CROSS-UK
Shop/domestic building collapse
A two storey corner (end of terrace) property fronting a very busy, narrow major route collapsed during the construction of a new basement.
1 January 2009
CROSS Safety Report
Report ID: 123
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.