Rotting plywood decking on grandstand
During visual structural inspections of temporary demountable grandstands, a walkway board failed when it was walked on.
31 May 2022
CROSS Safety Report
Report ID: 1092
Region: CROSS-UK
Critical welding of structural steelwork missed
The designer of a steelwork roof frame found a critical fabrication error when inspecting steelwork on site before it was erected.
21 November 2022
CROSS Safety Report
Report ID: 1126
Region: CROSS-UK
Failure to grout steel frame bases
A reporter describes a problem that arose during the construction stage of a project when a steel frame supporting pipe and cable racks was loaded before the frame baseplates were grouted.
24 May 2023
CROSS Safety Report
Report ID: 1190
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Steel column erection anchoring connection failure injured worker
This report describes how a construction worker was injured during the erection of a steel column due to shortcomings in erection procedures and inadequacies in a column base connection.
10 May 2021
CROSS Safety Report
Report ID: 992
Region: CROSS-US
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Concerns about punching shear in a flat slab
This report concerns potential shear failures in flat slabs. This originates from inconsistent design and detailing of the shear reinforcement where a proprietary shear link system is assumed in the design but not followed in detailing.
13 December 2021
CROSS Safety Report
Report ID: 1050
Region: CROSS-UK
Mandatory seismic retrofit construction with quality control problems
Standard seismic retrofit details were used for a building with a non-standard foundation, resulting in inadequate connection of structural shear walls to foundations.
1 September 2020
CROSS Safety Report
Report ID: 888
Region: CROSS-US
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Checking reinforcement before concrete pours
A reporter shares their concerns about incorrect rebar positioning on site prior to concrete being poured.
1 July 2020
CROSS Safety Report
Report ID: 894
Region: CROSS-UK