Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- (-) CROSS-UK [sub-heading only] (29)
- CROSS Newsletter (13)
- CROSS Safety Report (29)
- News [sub-heading only] (7)
CROSS regions
Deficiencies on access scaffold
Investigation by a reporter’s firm into an access scaffold on a refurbishment contract on a city centre site brought to light a number of deficiencies which rendered the scaffold out with its design parameters.
1 April 2011
CROSS Safety Report
Report ID: 219
Region: CROSS-UK
Wall reinforcement cages collapse
A contractor says that they have experienced two cases of wall reinforcement cages collapsing.
1 April 2013
CROSS Safety Report
Report ID: 357
Region: CROSS-UK
Open balustrade balconies over a public highway
A reporter raises concerns about the construction of a large residential development adjacent to a public highway where the balconies over sail the footpath.
1 October 2015
CROSS Safety Report
Report ID: 495
Region: CROSS-UK
Tower crane - failure of loadbearing part
A tower crane suffered a failure of one of its four main legs approximately 12m below the slew ring.
1 October 2014
CROSS Safety Report
Report ID: 399
Region: CROSS-UK
Principal designers’ obligations for temporary works
A correspondent believes that the new BS5975 standard places some onerous temporary work duties on the principal designer.
1 January 2020
CROSS Safety Report
Report ID: 870
Region: CROSS-UK
Emergency motorway lane closure during concrete repairs
This report highlights how confusion during concrete repair works led to an unplanned emergency lane closure of a bridge carrying a motorway.
1 July 2020
CROSS Safety Report
Report ID: 926
Region: CROSS-UK
Safe use of lifting magnets
A reporter highlights how a two-tonne lift using magnetic lifting equipment was abandoned, averting a potential high consequence event.
1 October 2019
CROSS Safety Report
Report ID: 849
Region: CROSS-UK
Post-tensioned slab failure during tendon stressing operations
A reporter disseminates the lessons learned after the end of a slab burst while stressing the tendons in a post-tensioned concrete slab.
1 April 2020
CROSS Safety Report
Report ID: 882
Region: CROSS-UK
Disproportionate collapse assessment of large panel system buildings
A reporter has become concerned by the approach being taken by some engineers to assess the risk of disproportionate collapse due to fire in large panel system (LPS) buildings.
1 January 2020
CROSS Safety Report
Report ID: 885
Region: CROSS-UK
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK