Design
Fire incident response
Project type
- Alteration & conversion project (1)
- Assessment project [sub-heading only] (6)
- Construction project [sub-heading only] (26)
- Demolition project (5)
- Excavation (5)
- Fire safety assessment (2)
- Groundworks project (2)
- New build (10)
- Refurbishment (1)
- Remediation project (1)
- Repair project (1)
- Strengthening project (1)
- Structural assessment (8)
Structural form
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 42 (3)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (29)
- CROSS Newsletter (16)
- CROSS Safety Alert (2)
- CROSS Safety Report (47)
- CROSS Topic Paper (1)
- News [sub-heading only] (7)
- Safety information from CROSS [sub-heading only] (1)
CROSS regions
RAAC planks in a 1970s shopping centre
An existing large shopping centre built circa 1975 had a number of external storerooms and loading bays with roofs constructed using reinforced autoclaved aerated concrete (RAAC) planks. The planks had deflected to the extent that they needed replacing.
20 February 2023
CROSS Safety Report
Report ID: 1155
Region: CROSS-UK
Construction period of RAAC planks
A reporter says that there are structural issues with reinforced autoclaved aerated concrete (RAAC) panels installed in a building as late as 1998. This date is significantly later than previous reports suggest as the last significant use of RAAC elements in the UK.
20 February 2023
CROSS Safety Report
Report ID: 954
Region: CROSS-UK
Stunts on bridges cause concern
A thrill-seeker travelling up and over the arch of a bridge, risking serious injury to themselves and others, raises the concerns of a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1136
Region: CROSS-UK
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Reinforced aerated autoclaved concrete planks found on pitched roof of 1990s hospital building
A building constructed in the early 1990s has been found to contain reinforced aerated autoclaved concrete (RAAC) planks. This date is important since it is much later than the previously thought last significant use of RAAC in buildings in the UK and potentially affects the scope of buildings that could require screening for RAAC problems.
26 August 2022
CROSS Safety Report
Report ID: 1125
Region: CROSS-UK
Object rolling into live carriageway
A disc of concrete rolled from a construction area onto a live carriageway, colliding with a passing vehicle.
6 June 2022
Report ID: 1089
Region: CROSS-UK
Rotting plywood decking on grandstand
During visual structural inspections of temporary demountable grandstands, a walkway board failed when it was walked on.
31 May 2022
CROSS Safety Report
Report ID: 1092
Region: CROSS-UK
Fire safety concern over green walls
This report discusses how building close down procedures that include isolating automated water systems might result in the drying out of green walls, thus presenting a significant fire hazard in external walls.
13 August 2021
CROSS Safety Report
Report ID: 976
Region: CROSS-UK
Fire exit chained closed due to COVID-19 concerns
A key pad operated fire exit was chained closed to prevent the spread of COVID-19.
13 August 2021
CROSS Safety Report
Report ID: 975
Region: CROSS-UK
Unsafe excavation practices
A builder undermined the existing footing of a masonry wall without being aware of the risks.
30 July 2021
CROSS Safety Report
Report ID: 1026
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.