Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Trench sheet naming confusion
A reporter involved with temporary works design has been made aware that there are two suppliers providing a trench sheet under the same name.
30 June 2022
CROSS Safety Report
Report ID: 814
Region: CROSS-UK
Concern that the structural design of some recent buildings may not have been checked
A reporter has become increasingly concerned that some buildings may be structurally non-compliant for a number of reasons.
26 August 2022
CROSS Safety Report
Report ID: 1120
Region: CROSS-UK
Rotting plywood decking on grandstand
During visual structural inspections of temporary demountable grandstands, a walkway board failed when it was walked on.
31 May 2022
CROSS Safety Report
Report ID: 1092
Region: CROSS-UK
Design deficiencies in long span steelwork portal
A firm commissioned to design steel joints on a large portal frame structure noticed that there was lack of restraint to a series of long span rafters.
1 October 2013
CROSS Safety Report
Report ID: 329
Region: CROSS-UK
Steel stud failures during bridge construction
This report concerns the failure of a steel studs during construction works on a new bridge associated with major road improvements.
1 October 2012
CROSS Safety Report
Report ID: 332
Region: CROSS-UK
Concerns with propping design to large excavations
Concerns are raised about the design of propping to large excavations and particularly about the design of the connections for a raking prop to a horizontal waler.
1 January 2019
CROSS Safety Report
Report ID: 298
Region: CROSS-UK
Checking reinforcement before concrete pours
A reporter shares their concerns about incorrect rebar positioning on site prior to concrete being poured.
1 July 2020
CROSS Safety Report
Report ID: 894
Region: CROSS-UK