Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (19)
- CROSS Newsletter (10)
- CROSS Safety Report (22)
- News [sub-heading only] (5)
CROSS regions
Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Collapse of brickwork cladding
The external leaf of a brickwork pier at first floor level fell down onto the playground of a school adjacent to the main entrance door.
1 October 2007
CROSS Safety Report
Report ID: 84
Region: CROSS-UK
Mobile phone masts
The concern of an overseas reporter is that erection, foundation design and construction, and maintenance of mobile phone masts are not carried out adequately.
1 March 2006
CROSS Safety Report
Report ID: 22
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Collapse of tank falsework
This report relates to the collapse of falsework erected to construct an in situ, reinforced concrete, circular water retaining structure.
1 October 2009
CROSS Safety Report
Report ID: 150
Region: CROSS-UK
Collapse of proprietary timber roof
A proprietary timber roof system spanning 8m over a school hall collapsed. The roof was constructed in 1959, and formed from a ply-web beam system, with hardboard ceiling and ply deck and asphalt covering.
1 January 2012
CROSS Safety Report
Report ID: 273
Region: CROSS-UK
Nuts falling from tension glazing system
A reporter raises concerns about the fixings used in a tension glazing system.
1 July 2013
CROSS Safety Report
Report ID: 340
Region: CROSS-UK
Timber roof truss bracing problem
Lateral movement of the roof tiles on a two-storey mid-terrace house built approximately 35 years ago with a trussed rafter roof led to the discovery of broken bracing.
1 July 2014
CROSS Safety Report
Report ID: 354
Region: CROSS-UK
Concern about bridge hangers
A reporter is concerned that a failure in recent years involving the cast connections at each end of vertical bars, which connected to a bow string arch at one end and to a bridge deck at the other, may be in use elsewhere.
1 July 2012
CROSS Safety Report
Report ID: 222
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.