Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK [sub-heading only] (17)
- CROSS Newsletter (19)
- CROSS Safety Report (26)
- News [sub-heading only] (6)
CROSS regions
Checking reinforcement before concrete pours
A reporter shares their concerns about incorrect rebar positioning on site prior to concrete being poured.
1 July 2020
CROSS Safety Report
Report ID: 894
Region: CROSS-UK
Crane outrigger loads underestimated due to misuse of software
A reporter is concerned about how the misuse of software can lead to incorrect outrigger loads being used in the design of foundations for crane outriggers.
1 April 2020
CROSS Safety Report
Report ID: 915
Region: CROSS-UK
Structures at risk from scour and erosion
Following some recent structural failures, a reporter is concerned that asset owners may not fully realise risks associated with scour and erosion.
1 January 2020
CROSS Safety Report
Report ID: 617
Region: CROSS-UK
Tower crane foundation design error
Whilst carrying out an independent design check on a tower crane foundation design, a reporter discovered that the piles used on site did not have the required tension capacity.
1 July 2018
CROSS Safety Report
Report ID: 662
Region: CROSS-UK
Concern about foundations to telecoms masts
Concerns are raised about a potential safety problem with the design and construction of ‘root’ foundations for telecom poles.
1 January 2018
CROSS Safety Report
Report ID: 690
Region: CROSS-UK
Multi-storey car park foundations
Concerns are raised about the integrity of a completed car park structure following poor quality control procedures during construction.
1 October 2017
CROSS Safety Report
Report ID: 630
Region: CROSS-UK
Share your knowledge
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.
Cantilever signal base failure - holding down bolts in bending

A railway asset owner noticed that a 9m cantilever signal structure was sagging alarmingly and stopped trains on the line to investigate the matter.
1 October 2017
CROSS Safety Report
Report ID: 627
Region: CROSS-UK
Concerns over unreinforced lighting column foundation

Concerns were raised on a major highway project after it was noticed that the contractor was casting a pad foundation with no reinforcement in the base.
1 July 2017
CROSS Safety Report
Report ID: 652
Region: CROSS-UK
Settlement of driven piles
A railway platform was constructed on piled foundations and it was noticed that one pair of piles and their associated cross head settled soon afterwards.
1 April 2017
CROSS Safety Report
Report ID: 607
Region: CROSS-UK
High mast light poles removed from UK site

Five high mast light poles (HMLPs) were removed from a public site as it was considered that there was a possibility of collapse.
1 January 2017
CROSS Safety Report
Report ID: 610
Region: CROSS-UK