Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Construction
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Long term risks for ground anchors
A reporter is concerned about the inspection and maintenance of ground anchors that are used for strategic flood defences.
1 October 2007
CROSS Safety Report
Report ID: 87
Region: CROSS-UK
Small bridge inspection
A student discovered corrosion on a small bridge while carrying out a survey for their final project/dissertation.
1 March 2006
CROSS Safety Report
Report ID: 23
Region: CROSS-UK
Flaws with partial encasements around steel columns
A structural assessment found that steel columns encased in concrete to mid-storey height were heavily corroded directly above the top of the encasements.
1 January 2016
CROSS Safety Report
Report ID: 517
Region: CROSS-UK
Freeze/thaw effects on RHSs and unexpected hydrogen generation
A reporter provides their views of the freezing effects on rectangular hollow sections (RHSs) and how this could be related to Liquid Metal Assisted Cracking.
1 October 2014
CROSS Safety Report
Report ID: 434
Region: CROSS-UK
Deflection of bridge girder under load
A report was received from a bridge examiner to say outer main girder of a short span railway bridge was moving up to 30mm under load.
1 July 2016
CROSS Safety Report
Report ID: 557
Region: CROSS-UK
Defects found in previously repaired bridge
While carrying out strengthening work on a bridge, there was concern that by removing the non-structural encasement, alternative load paths had been removed.
1 April 2016
CROSS Safety Report
Report ID: 564
Region: CROSS-UK
Further report on freezing of water in hollow sections
A reporter has a further warning on the issue of freeze/thaw cracking following report 434 after their firm encountered a similar problem on a UK project and investigated the matter.
1 January 2017
CROSS Safety Report
Report ID: 579
Region: CROSS-UK
Square Hollow Section (SHS) expansion due to freezing
A reporter has come across problems in British Columbia (temp range -30 degrees to +40 degrees) of cracking to square hollow sections (SHS) due to the ingress of water and freezing.
1 April 2017
CROSS Safety Report
Report ID: 641
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.