Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (3)
- Assessment project [sub-heading only] (1)
- Construction project [sub-heading only] (56)
- Demolition project (2)
- Excavation (2)
- Extension project (2)
- New build (36)
- Refurbishment (1)
- Remediation project (3)
- Repair project (2)
- Strengthening project (1)
- Structural assessment (1)
Method of construction
Elements & systems
- Balconies (4)
- Balustrades (6)
- Basements (1)
- Beams (34)
- Bracing (11)
- Cables (1)
- Canopies (1)
- Ceilings (1)
- Cladding (5)
- Columns (17)
- Fasteners & connections (60)
- Fire protection (3)
- Foundations (8)
- Insulation (1)
- Light gauge steel framing (6)
- Lintels (1)
- Padstones (4)
- Parapets (3)
- PV panels (1)
- Roofs (8)
- Signs (1)
- Slabs (2)
- Trusses (2)
- Walls (7)
- Wall ties (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (5)
- CROSS-UK Newsletter 1 (2)
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 4 (5)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (4)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (4)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (79)
- CROSS-US Newsletter 3 (2)
- CROSS Newsletter (57)
- CROSS Safety Report (124)
- CROSS Topic Paper (1)
- News [sub-heading only] (21)
- Safety information from CROSS [sub-heading only] (1)
CROSS regions
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Possible galvanising concern
A reporter has a question about using galvanised steel poles for the members of dome structures.
1 November 2006
CROSS Safety Report
Report ID: 48
Region: CROSS-UK
Liquid metal assisted cracking
Large cracks appeared down the sides of gusset welds after a truss was erected on site.
1 November 2006
CROSS Safety Report
Report ID: 49
Region: CROSS-UK
Liquid metal assisted cracking (LMAC)
A reporter raises concerns about the risk of liquid metal assisted cracking during the hot dip galvanising process.
1 November 2006
CROSS Safety Report
Report ID: 45
Region: CROSS-UK
Fixings to steelwork
The use of proprietary self tapping screws to fix to materials thicker than 10-12mm is questioned by a reporter.
1 November 2006
CROSS Safety Report
Report ID: 44
Region: CROSS-UK
Failure of blind bolts
There was a partial collapse of a steel frame building due to the failure of some blind bolts during the construction period. Loads at the time were well below anticipated failure levels.
1 April 2007
CROSS Safety Report
Report ID: 71
Region: CROSS-UK
Steelwork delivered to site
The contractor on a domestic building project reported that there were deficiencies in steelwork supplied to site.
1 October 2007
CROSS Safety Report
Report ID: 80
Region: CROSS-UK
Balustrades in public buildings
A reporter had a concern regarding a timber balustrade in a showroom.
1 February 2007
CROSS Safety Report
Report ID: 61
Region: CROSS-UK
FC Twente stadium roof collapse
This paper concerns the collapse at the FC Twente Stadium in Holland in 2011 when part of a cantilever steel frame roof failed during erection.
1 July 2014
CROSS Topic Paper
Region: CROSS-UK