Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (15)
- CROSS-UK Newsletter 2 (9)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 22 (4)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 44 (5)
- CROSS-UK Newsletter 45 (4)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (4)
- CROSS-UK Newsletter 56 (4)
- CROSS-UK Newsletter 57 (4)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (73)
- CROSS Newsletter (26)
- (-) CROSS Safety Report (75)
- (-) News [sub-heading only] (75)
CROSS regions
Unprotected deep excavation
On a construction site by a busy main road a reporter saw a deep excavation with no internal temporary works.
1 November 2005
CROSS Safety Report
Report ID: 16
Region: CROSS-UK
Design of timber structures
An approximate design led to a timber roof deflecting considerably.
1 November 2005
CROSS Safety Report
Report ID: 17
Region: CROSS-UK
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Removal of internal structure
The roof trusses, 6m above the ground floor, had been left supported on props made by nailing floor joists together; one at each party wall position.
1 July 2006
CROSS Safety Report
Report ID: 46
Region: CROSS-UK
Possible galvanising concern
A reporter has a question about using galvanised steel poles for the members of dome structures.
1 November 2006
CROSS Safety Report
Report ID: 48
Region: CROSS-UK
Liquid metal assisted cracking
Large cracks appeared down the sides of gusset welds after a truss was erected on site.
1 November 2006
CROSS Safety Report
Report ID: 49
Region: CROSS-UK
Responsibility for change
The inadequate substitution of lintels led to them buckling, and the surrounding masonry cracking.
1 February 2007
CROSS Safety Report
Report ID: 50
Region: CROSS-UK
Building regulations submissions
This report has been written on behalf of a group of senior local government structural engineers who refer to previous CROSS newsletters and in particular the reports relating to the poor quality of building regulation submissions and lack of checking resources.
1 July 2007
CROSS Safety Report
Report ID: 65
Region: CROSS-UK
Small bridge inspection
A student discovered corrosion on a small bridge while carrying out a survey for their final project/dissertation.
1 March 2006
CROSS Safety Report
Report ID: 23
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK