Safety information search results
Filter your results
Building or structure type
- Bridges (7)
- Buildings
(42)
- Agricultural buildings (1)
- Car parks (1)
- Commercial (2)
- Education, science & art buildings (4)
- Health care (1)
- Higher-risk buildings (2)
- Industrial buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (3)
- Residential (18)
- Storage buildings (1)
- Tall buildings (2)
- Theatres & other entertainment buildings (1)
- Floating structures (1)
- Marine structures (1)
- Masts & towers (3)
- Retaining structures (2)
- Temporary structures (3)
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-UK Newsletter 1 (3)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (31)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (17)
- CROSS Safety Report (52)
- News [sub-heading only] (10)
CROSS regions
Incompetent design of simple steel beams
This report concerns designs for simple steel beams submitted to building control bodies under Part A of the Building Regulations. The reporter, a checking engineer for a building control body, was not able to accept the effective length and restraints assumed in a number of submitted designs. Most originated from individuals who used proprietary structural design computer packages without, i...
24 May 2023
CROSS Safety Report
Report ID: 1183
Region: CROSS-UK
Inadequate design and procurement of large steel roof structure
This report demonstrates the importance of following the correct process for project procurement, including preparing a detailed design and project specification, and certificating compliance with the relevant building codes. It also covers the potential consequences when shortcuts are taken.
30 March 2023
CROSS Safety Report
Report ID: 1123
Region: CROSS-AUS
Further example of incorrect finite element modelling
Concerns in respect of the sufficiency of finite element modelling of masonry walls as part of a reinforced concrete framed building.
20 February 2023
CROSS Safety Report
Report ID: 1145
Region: CROSS-UK
Critical welding of structural steelwork missed
The designer of a steelwork roof frame found a critical fabrication error when inspecting steelwork on site before it was erected.
21 November 2022
CROSS Safety Report
Report ID: 1126
Region: CROSS-UK
Connection fixity considerations for steel frame modelling
This report concerns the modelling of joints when using computer programs. In some cases, engineers are applying rotational releases to joints in models but subsequently designing the connections as rigid. This leaves a fundamental mismatch between analysis and design which may lead to unsafe structural connections argues a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1139
Region: CROSS-UK
Incorrect modelling of a cantilever
A steel framed building was incorrectly modelled and designed resulting in excessive deflection of part of the frame even before the frame was loaded with the self-weight of the building.
17 November 2022
CROSS Safety Report
Report ID: 1144
Region: CROSS-UK
Has the role of building control changed?
A reporter raises a query about the role of Building Control.
5 September 2022
CROSS Safety Report
Report ID: 810
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Unsafe design of retrofit cantilever balconies
A structural assessment of a number of new balconies being added to an existing building revealed critical concerns in respect of fixings back into the existing brickwork.
26 August 2022
CROSS Safety Report
Report ID: 1128
Region: CROSS-UK
Concern that the structural design of some recent buildings may not have been checked
A reporter has become increasingly concerned that some buildings may be structurally non-compliant for a number of reasons.
26 August 2022
CROSS Safety Report
Report ID: 1120
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.