- Alteration & conversion project (2)
- Assessment project [sub-heading only] (6)
- Construction project [sub-heading only] (29)
- Demolition project (4)
- Excavation (4)
- Extension project (2)
- Fire safety assessment (2)
- Groundworks project (1)
- New build (10)
- Refurbishment (1)
- Remediation project (1)
- Repair project (1)
- Strengthening project (1)
- Structural assessment (6)
Method of construction
Structural form
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 42 (3)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (38)
- CROSS Newsletter (19)
- CROSS Safety Alert (7)
- CROSS Safety Report (58)
- CROSS Topic Paper (12)
- News [sub-heading only] (9)
- Safety information from CROSS [sub-heading only] (2)
CROSS regions
Timber framed buildings in fire situations - the role of the designer
This 2010 paper was updated in 2014 and the newer version should be used for reference.
1 November 2010
CROSS Topic Paper
Region: CROSS-UK
FC Twente stadium roof collapse
This paper concerns the collapse at the FC Twente Stadium in Holland in 2011 when part of a cantilever steel frame roof failed during erection.
1 July 2014
CROSS Topic Paper
Region: CROSS-UK
Timber framed buildings in fire situations - the role of the designer - update
This is an update of an earlier paper because there had been a number of severe fires in timber framed buildings during construction.
1 March 2015
CROSS Topic Paper
Region: CROSS-UK
Risks with large screens at public events
The rapid development of large screen technology has resulted in the common use of these systems. The intent of this note is to examine their use from a structural safety perspective.
1 February 2008
CROSS Topic Paper
Region: CROSS-UK
Independent review through peer assist
The independent review has been developed to promote a more interactive and timely process tuned to the specific needs of the project team.
1 January 2009
CROSS Topic Paper
Region: CROSS-UK
Risk management bibliography
This is a bibliography of publications relating to risk management in design and construction produced in 2009.
1 September 2009
CROSS Topic Paper
Region: CROSS-UK
Major cast metal components
Buildings and bridges may utilise cast metal components for a variety of reasons and applications. These include the ability to be shaped for structural or aesthetic purposes and to transfer loads at the interface between differing structural components.
1 March 2010
CROSS Topic Paper
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Long term risks for ground anchors
A reporter is concerned about the inspection and maintenance of ground anchors that are used for strategic flood defences.
1 October 2007
CROSS Safety Report
Report ID: 87
Region: CROSS-UK
Toughened glass failures
The number of failures of heat-soaked toughened glass leads to a finding that the glass produced by some processors has not been properly heat-soaked and is therefore much more likely to shatter in use.
17 November 2022
CROSS Safety Report
Report ID: 1135